AmendmentDated 23 Sep 2024Published in the Gazette 23 Sep 2024Notification No. 14 of 2024 dated 23/09/2024

Amends the Electricity Supply Code and Related Matters Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's Fourth Amendment to its Electricity Supply Code and Related Matters Regulations, 2015, published in the Gujarat Government Gazette Extraordinary on 23 September 2024 (p1). It is a two-clause amendment and can be read in a few minutes.

Clause 1 gives the short title and commencement: the amendment takes effect from the date of publication in the Official Gazette (p1).

Clause 2 substitutes Clause 3.2 of Section 3 of the Principal Code, which governs the rated voltage at which AC supply is given (p1–2). The substituted clause lays out a table mapping consumer categories to single-phase or three-phase supply and sets the contract-demand thresholds at which consumers must move to 11 kV/22 kV and to 33 kV and above. It lets a consumer opt for a higher voltage profile even when the contracted load is below the threshold. For existing consumers already supplied at a lower voltage, it directs the licensee to make a commercially viable offer — weighing reduction in transmission and distribution losses and relief on transformer loading — to encourage a shift to the next higher voltage, but preserves continued supply at the existing voltage, with the new limits applying if their load later increases.

Clause 3 amends Point No. 7 of Annexure I (Form A-1), widening the three-phase load-detail band to 'Three Phase (above 6 kW to 100 kW or 150 kW if opted by the applicant/consumer)' (p2).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document