GERC · Gujarat Electricity Regulatory Commission
Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024
AmendmentDated 23 Sep 2024Published in the Gazette 23 Sep 2024Notification No. 14 of 2024 dated 23/09/2024
Amends the Electricity Supply Code and Related Matters Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's Fourth Amendment to its Electricity Supply Code and Related Matters Regulations, 2015, published in the Gujarat Government Gazette Extraordinary on 23 September 2024 (p1). It is a two-clause amendment and can be read in a few minutes.
Clause 1 gives the short title and commencement: the amendment takes effect from the date of publication in the Official Gazette (p1).
Clause 2 substitutes Clause 3.2 of Section 3 of the Principal Code, which governs the rated voltage at which AC supply is given (p1–2). The substituted clause lays out a table mapping consumer categories to single-phase or three-phase supply and sets the contract-demand thresholds at which consumers must move to 11 kV/22 kV and to 33 kV and above. It lets a consumer opt for a higher voltage profile even when the contracted load is below the threshold. For existing consumers already supplied at a lower voltage, it directs the licensee to make a commercially viable offer — weighing reduction in transmission and distribution losses and relief on transformer loading — to encourage a shift to the next higher voltage, but preserves continued supply at the existing voltage, with the new limits applying if their load later increases.
Clause 3 amends Point No. 7 of Annexure I (Form A-1), widening the three-phase load-detail band to 'Three Phase (above 6 kW to 100 kW or 150 kW if opted by the applicant/consumer)' (p2).
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.