Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Explanatory Memorandum for Draft Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Fifth Amendment) Regulations, 2026
Explanatory memorandum to a draftDated 17 Oct 2026
Draft
Voltaic holds no final regulation made from this draft.
Explanatory memorandum to the Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's Explanatory Memorandum for the draft GERC (Electricity Supply Code and Related Matters) (Fifth Amendment) Regulations, 2026 (p1). It sets out why the Commission proposes 16 changes to the 2015 Supply Code, mainly to align with the Electricity (Rights of Consumers) Rules, 2020, as amended, and with recent CEA meter and safety regulations (p1–2). It records that the ESCRP deliberated consumer and licensee proposals in five meetings between November 2025 and July 2026 (p1).
The memorandum works item by item. Each item quotes the existing Supply Code provision, gives the proposed text, and explains the rationale. Items 1–6 deal with connections and service: a new definition of 'owner' including legal heirs (p2); a 30-day limit for consumers to query the detailed bill, with the licensee's 10-day response retained, and 'per kW/kVA' relief in the estimates provisos (p2–7); a declaration-based route for LT connections up to 150 kW so that the test report can follow release, implementing an EPD Gujarat order, with submission within 45 days and possible disconnection for default (p7–13); longer temporary connections for construction, up to three years at a time (p13–14); prepayment or consumer meters for all temporary connections (p14); and confinement of 'shifting of premises' to agriculture, with shifting of installation within the same premises (p14–15).
Items 7–13 deal with metering, billing and communication: replacing 'smart pre-payment meter' with 'smart meter with pre-payment functionality' to match the amended CEA Meters Regulations (p15–19); reckoning the meter-photograph window from the fixed meter reading date (p19–20); allowing actual meter data to shorten the faulty-meter assessment period in Regulation 6.33 (p20–21); requiring registered mobile number and e-mail on the bill (p21–22); aligning the faulty-meter billing ceiling in Regulation 6.58 with Regulation 6.33 (p22–23); raising the cash/cheque/DD bill payment limit from Rs 1,000 to Rs 10,000 under Rule 7(2) of the RoC Rules (p24–25); and permitting service of notices by speed post and registered e-mail (p26–27).
Items 14–16 are consequential: amending Annexure I Form A-1 to match the shifting-of-premises change (p27), updating references to the CEA Safety Regulations from 2010 to 2023 and dropping specific clause numbers (p28–29), and updating references to the repealed GERC Standards of Performance Regulations, 2005 to the 2023 Regulations (p29–30). The memorandum does not itself amend the Supply Code; it explains the draft amendment for consultation.
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.