Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft

Explanatory Memorandum for Draft Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Fifth Amendment) Regulations, 2026

Explanatory memorandum to a draftDated 17 Oct 2026

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's Explanatory Memorandum for the draft GERC (Electricity Supply Code and Related Matters) (Fifth Amendment) Regulations, 2026 (p1). It sets out why the Commission proposes 16 changes to the 2015 Supply Code, mainly to align with the Electricity (Rights of Consumers) Rules, 2020, as amended, and with recent CEA meter and safety regulations (p1–2). It records that the ESCRP deliberated consumer and licensee proposals in five meetings between November 2025 and July 2026 (p1).

The memorandum works item by item. Each item quotes the existing Supply Code provision, gives the proposed text, and explains the rationale. Items 1–6 deal with connections and service: a new definition of 'owner' including legal heirs (p2); a 30-day limit for consumers to query the detailed bill, with the licensee's 10-day response retained, and 'per kW/kVA' relief in the estimates provisos (p2–7); a declaration-based route for LT connections up to 150 kW so that the test report can follow release, implementing an EPD Gujarat order, with submission within 45 days and possible disconnection for default (p7–13); longer temporary connections for construction, up to three years at a time (p13–14); prepayment or consumer meters for all temporary connections (p14); and confinement of 'shifting of premises' to agriculture, with shifting of installation within the same premises (p14–15).

Items 7–13 deal with metering, billing and communication: replacing 'smart pre-payment meter' with 'smart meter with pre-payment functionality' to match the amended CEA Meters Regulations (p15–19); reckoning the meter-photograph window from the fixed meter reading date (p19–20); allowing actual meter data to shorten the faulty-meter assessment period in Regulation 6.33 (p20–21); requiring registered mobile number and e-mail on the bill (p21–22); aligning the faulty-meter billing ceiling in Regulation 6.58 with Regulation 6.33 (p22–23); raising the cash/cheque/DD bill payment limit from Rs 1,000 to Rs 10,000 under Rule 7(2) of the RoC Rules (p24–25); and permitting service of notices by speed post and registered e-mail (p26–27).

Items 14–16 are consequential: amending Annexure I Form A-1 to match the shifting-of-premises change (p27), updating references to the CEA Safety Regulations from 2010 to 2023 and dropping specific clause numbers (p28–29), and updating references to the repealed GERC Standards of Performance Regulations, 2005 to the 2023 Regulations (p29–30). The memorandum does not itself amend the Supply Code; it explains the draft amendment for consultation.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Metering, Billing and payment

Read with this

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.