Skip to content

GERC · Gujarat Electricity Regulatory Commission

Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2023 — Statement of Reasons

STATEMENT OF REASONS

Statement of reasonsDated 5 Dec 2023

The commission's reasons for the Electricity Supply Code and Related Matters Regulations, 2015 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software, from pages 1 to 35 of 42. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's Statement of Reasons for the GERC (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2023 (pp1–2). It records the background: the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020, as amended on 28.06.2021, and the 18.01.2021 letter requiring state regulators to align their regulations, led GERC to propose amendments to its 2015 Supply Code. Public notices were issued on 21.02.2022, comments closed 25.03.2022, and a public hearing was held on 04/05/2022 (pp1–2).

The bulk of the document is a clause-by-clause stakeholder consultation record. For each draft clause it reproduces the draft text, summarises stakeholder comments/suggestions, and gives the Commission's decision (pp2–35). It thus doubles as an explanatory memorandum and a decision record for the final amendment.

A large block of the discussion concerns definitions and application procedure — 'Applicant', 'Application Form', 'Disconnection', 'Occupier'; display and tracking of application status; modes of application including a 24/7 call centre and doorstep service for senior citizens; documents for new connections; processing and deficiency intimation timelines; HT/EHT routing to the transmission licensee; and refund of excess amounts (pp2–15).

Another substantial block covers metering and billing — meter type and ownership options, installation and replacement notices, provisional billing, meter testing and third-party testing, burnt meter liability and restoration, tariff and FPPPA display, bill preparation/delivery, duplicate bills, bill content, and payment modes and rebate (pp15–35). The document also states that the applicability clause of the Code is amended so the Regulations apply to Transmission Licensees for the purposes of Clause 4.32 (p11). The objector lists in Annexures 1 and 2 are not reproduced in these pages.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Metering

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document