STATEMENT OF REASONS
Statement of reasonsDated 5 Dec 2023
The commission's reasons for the Electricity Supply Code and Related Matters Regulations, 2015 or one of its amendments.
Summary
Summary written by software, from pages 1 to 35 of 42. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's Statement of Reasons for the GERC (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2023 (pp1–2). It records the background: the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020, as amended on 28.06.2021, and the 18.01.2021 letter requiring state regulators to align their regulations, led GERC to propose amendments to its 2015 Supply Code. Public notices were issued on 21.02.2022, comments closed 25.03.2022, and a public hearing was held on 04/05/2022 (pp1–2).
The bulk of the document is a clause-by-clause stakeholder consultation record. For each draft clause it reproduces the draft text, summarises stakeholder comments/suggestions, and gives the Commission's decision (pp2–35). It thus doubles as an explanatory memorandum and a decision record for the final amendment.
A large block of the discussion concerns definitions and application procedure — 'Applicant', 'Application Form', 'Disconnection', 'Occupier'; display and tracking of application status; modes of application including a 24/7 call centre and doorstep service for senior citizens; documents for new connections; processing and deficiency intimation timelines; HT/EHT routing to the transmission licensee; and refund of excess amounts (pp2–15).
Another substantial block covers metering and billing — meter type and ownership options, installation and replacement notices, provisional billing, meter testing and third-party testing, burnt meter liability and restoration, tariff and FPPPA display, bill preparation/delivery, duplicate bills, bill content, and payment modes and rebate (pp15–35). The document also states that the applicability clause of the Code is amended so the Regulations apply to Transmission Licensees for the purposes of Clause 4.32 (p11). The objector lists in Annexures 1 and 2 are not reproduced in these pages.
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.