Skip to content

GERC · Gujarat Electricity Regulatory Commission

Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024

GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) CORRIGENDUM IN NOTIFICATION NO. 01 OF 2023

CorrigendumDated 1 Jan 2024Published in the Gazette 1 Jan 2024Notification No. GERC/01/2024 dated 01-01-2024

Corrects the Electricity Supply Code and Related Matters Regulations, 2015 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page corrigendum issued by the Gujarat Electricity Regulatory Commission and published in the Gujarat Government Gazette (Extraordinary, Part IV-C) on 1 January 2024 (p1). It corrects Notification No. 1 of 2023 dated 05.12.2023 — the GERC (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2023 — which had amended the 2015 Supply Code. Rather than fixing typographical slips, each item restates a clause in full with the words "shall now be read as under" (pp1–2).

Item 1 replaces the definition of "Applicant" in clause 2.3(3), widening it to cover an owner or occupier applying to a distribution licensee not only for supply but also for load/contract-demand changes, change in title or name (mutation), change of consumer category, disconnection or restoration, termination of agreement, shifting of connection and other services (p1).

Item 2 restates clause 4.32, which governs HT/EHT applications: it sets the distribution licensee's timeline for forwarding an application to the transmission licensee, the transmission licensee's timeline for intimating feasibility, same-day communication of those comments to the applicant, and the demand-note timeline keyed to the GERC (Standard of Performance of Distribution Licensee) Regulations, 2005 — with a proviso excluding time taken by the applicant in complying with clause 4.29 (p2).

Item 3 restates clause 4.110 on modes of payment, imposing a cash ceiling, prescribing banker's cheque/demand draft payable at any branch of a scheduled commercial bank, and requiring the licensee to create an e-payment facility (p2). Item 4 restates clause 6.49 on billing: billing cycles based on actual meter reading except for prepayment meters, bill-on-request for prepayment consumers, SMS/email intimation of bill dispatch with amount and due date, upload of the bill on the licensee's website on the day of generation, and website availability of a year's billing and payment-receipt details to registered consumers (p2).

No commencement clause is stated; the document is dated and gazetted the same day and is signed by the Secretary, GERC (pp1–2).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Billing and payment, Metering

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document