Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2022
Draft amendmentDated 19 Feb 2022
Draft
A proposal that has since been finalised as the Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment — the third — to Gujarat's Electricity Supply Code, 2015. Issued by GERC on 19 February 2022 (p27), it rewrites a long list of clauses of the Principal Code rather than creating a new instrument, and comes into force from the date of publication in the Official Gazette (p1).
The first block (pp2–3) replaces six definitions in Section 2 — Applicant, Application, Application Form, Disconnection, Maximum Demand and Occupier — widening 'Applicant' to cover load changes, title changes, consumer-category changes, disconnection/restoration, shifting and termination. It also proposes deleting Para 3 of the Principal Code (p2).
Section 4 amendments (pp3–13) are the bulk: what a distribution licensee must display about application procedures, documents and charges (4.4, 4.10, 4.61); new application channels — website, mobile app, a 24/7 toll-free call centre and a common CRM system with alerts, status tracking and auto-escalation, mandated within six months of notification (4.11, 4.62); documents required with an application, with a two-document proviso for connections up to 10 kW (4.12, p6); registration, acknowledgement numbering and application registers (4.21, 4.22, 4.24, 4.64–4.66); HT/EHT routing through the transmission licensee with feasibility timelines (4.32, p7); refund of excess amounts with late-payment interest (4.35, p8); self-executed extension works and installation testing, including Electrical Inspector approval above 440 V (4.39, p9); and payment modes (4.110, p13).
Section 6 (pp13–24) covers metering and billing: smart pre-payment or pre-payment meters as the default for new connections, subject to Commission-approved exemptions, with meter types set by consumer class (6.1, 6.5); consumer choice to buy meters (6.3); reading cycles and remote reading of smart meters (6.17); provisional billing and inaccessible meters (6.21, 6.22, 6.25, 6.57, 6.66, 6.67); third-party meter testing, allocation of test and meter costs, and appeal to the CGRF (6.30, 6.34–6.37); burnt-meter restoration (6.42, 6.46); bill content, delivery, duplicate bills and first-bill timelines (6.49–6.55); and payment modes with an e-payment rebate (6.74).
The rest covers disconnection and final settlement (Section 8, pp24–25) and consumer awareness, 24x7 supply and notice of interruptions (Section 9, pp25–27).
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.