Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2022

Draft amendmentDated 19 Feb 2022

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amendment — the third — to Gujarat's Electricity Supply Code, 2015. Issued by GERC on 19 February 2022 (p27), it rewrites a long list of clauses of the Principal Code rather than creating a new instrument, and comes into force from the date of publication in the Official Gazette (p1).

The first block (pp2–3) replaces six definitions in Section 2 — Applicant, Application, Application Form, Disconnection, Maximum Demand and Occupier — widening 'Applicant' to cover load changes, title changes, consumer-category changes, disconnection/restoration, shifting and termination. It also proposes deleting Para 3 of the Principal Code (p2).

Section 4 amendments (pp3–13) are the bulk: what a distribution licensee must display about application procedures, documents and charges (4.4, 4.10, 4.61); new application channels — website, mobile app, a 24/7 toll-free call centre and a common CRM system with alerts, status tracking and auto-escalation, mandated within six months of notification (4.11, 4.62); documents required with an application, with a two-document proviso for connections up to 10 kW (4.12, p6); registration, acknowledgement numbering and application registers (4.21, 4.22, 4.24, 4.64–4.66); HT/EHT routing through the transmission licensee with feasibility timelines (4.32, p7); refund of excess amounts with late-payment interest (4.35, p8); self-executed extension works and installation testing, including Electrical Inspector approval above 440 V (4.39, p9); and payment modes (4.110, p13).

Section 6 (pp13–24) covers metering and billing: smart pre-payment or pre-payment meters as the default for new connections, subject to Commission-approved exemptions, with meter types set by consumer class (6.1, 6.5); consumer choice to buy meters (6.3); reading cycles and remote reading of smart meters (6.17); provisional billing and inaccessible meters (6.21, 6.22, 6.25, 6.57, 6.66, 6.67); third-party meter testing, allocation of test and meter costs, and appeal to the CGRF (6.30, 6.34–6.37); burnt-meter restoration (6.42, 6.46); bill content, delivery, duplicate bills and first-bill timelines (6.49–6.55); and payment modes with an e-payment rebate (6.74).

The rest covers disconnection and final settlement (Section 8, pp24–25) and consumer awareness, 24x7 supply and notice of interruptions (Section 9, pp25–27).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Metering, Billing and payment

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document