Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum

STATEMENT OF REASONS

CorrigendumDated 1 Jan 2024

Corrects the Electricity Supply Code and Related Matters Regulations, 2015 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's Statement of Reasons-cum-Corrigendum dated 01/01/2024, signed at Gandhinagar by the Chairman and two Members (p1, p4). It exists to repair a mismatch: the GERC (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2023 were notified as Notification No. 1 of 2023 dated 05.12.2023, but several corrections the Commission had approved in the accompanying Statement of Reasons were not carried into the notified text, so the Commission decided to publish a corrigendum (p1).

Page 1 gives the background: the Ministry of Power notified the Electricity (Rights of Consumers) Rules, 2020 on 31.12.2020, amended them on 28.06.2021, and by letter dated 18.01.2021 asked state regulators to align their regulations; GERC did so through the Third Amendment after stakeholder comments, a public hearing and deliberations (p1).

Pages 2 to 4 carry the corrections, each clause reproduced twice — as notified in Notification No. 1 of 2023 and as approved in the Statement of Reasons — so the reader can see exactly what changes:

- Clause 2.3(3), the definition of 'Applicant': reworded from 'refers to' to 'means', and the cross-reference narrowed to 'the Act, rules and regulations' instead of 'the Act and the Supply Code, rules and regulations' (p2). - Clause 4.32, HT/EHT connection applications: the distribution licensee must forward the application to the transmission licensee within 2 working days instead of three days, and the transmission licensee's comments must reach the applicant on the same day rather than within three days thereafter (p2–3). - Clause 4.110, payment of demand notes: the cash ceiling is reduced from Rs 20,000 to Rs 10,000, with banker's cheque, demand draft and e-payment retained (p3). - Clause 6.49, billing: the sentence describing what the dispatch intimation must contain is repositioned after the SMS/e-mail intimation requirement; the rest of the clause is unchanged (p3–4).

The document closes by stating that a corrigendum to Notification No. 1 of 2023 is issued and notified covering those clauses (p4). No commencement date or savings clause is given.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.