GERC · Gujarat Electricity Regulatory Commission
Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (First Amendment) Regulations, 2016
AmendmentDated 22 Nov 2016Published in the Gazette 23 Nov 2016Notification No.6 of2016
Amends the Electricity Supply Code and Related Matters Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Gujarat Government Gazette notification (Extraordinary, Part IV-C, Vol. LVII, 23 November 2016) carrying Notification No. 6 of 2016, by which the Gujarat Electricity Regulatory Commission amends its Electricity Supply Code and Related Matters Regulations, 2015 — called "the principal Code" (p1). It is a clause-substitution amendment: eleven numbered clauses replace specific provisions of the 2015 Code rather than issuing a fresh code, and it comes into force from the date of gazette publication (p1).
Consumer documentation and bill payment. Clause 4.16 is replaced to list the documents acceptable as proof of ownership or occupancy of premises — registered sale or lease deed, agricultural land records, municipal tax demand notice for residential connections, allotment letters and village-level ownership certificates (p1–2). Clause 6.76 requires licensees to run enough collection centres, gives priority at payment windows to senior citizens, differently abled persons and women, and requires signage and ramp access (p2). Clause 6.77 governs the disconnection notice for defaulters and the consequences of a dishonoured cheque, including a restriction on accepted payment modes that runs on into the following financial year (p2).
Theft and unauthorised use. Clauses 7.6, 7.11, 7.18 and 7.29 are recast: disconnection and seizure of material evidence with a police complaint within a stated time limit of the disconnection; the signing and service of inspection reports, with a pasting-and-photograph fallback where the consumer refuses receipt; and recovery of an assessed amount only after written notice (p2–3). Clause 8.5 addresses prevention of unauthorised reconnection and transfer of pending dues where supply is restored through another live connection (p3).
Assessment formula. Annexure IV is amended twice — the meaning of 'H' in the assessment formula is tied back to Clause 7.7 of the 2015 Code, and the table entries for agriculture (metered) and direct theft are substituted (p3).
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.