Skip to content

GERC · Gujarat Electricity Regulatory Commission

Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (First Amendment) Regulations, 2016

AmendmentDated 22 Nov 2016Published in the Gazette 23 Nov 2016Notification No.6 of2016

Amends the Electricity Supply Code and Related Matters Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Gujarat Government Gazette notification (Extraordinary, Part IV-C, Vol. LVII, 23 November 2016) carrying Notification No. 6 of 2016, by which the Gujarat Electricity Regulatory Commission amends its Electricity Supply Code and Related Matters Regulations, 2015 — called "the principal Code" (p1). It is a clause-substitution amendment: eleven numbered clauses replace specific provisions of the 2015 Code rather than issuing a fresh code, and it comes into force from the date of gazette publication (p1).

Consumer documentation and bill payment. Clause 4.16 is replaced to list the documents acceptable as proof of ownership or occupancy of premises — registered sale or lease deed, agricultural land records, municipal tax demand notice for residential connections, allotment letters and village-level ownership certificates (p1–2). Clause 6.76 requires licensees to run enough collection centres, gives priority at payment windows to senior citizens, differently abled persons and women, and requires signage and ramp access (p2). Clause 6.77 governs the disconnection notice for defaulters and the consequences of a dishonoured cheque, including a restriction on accepted payment modes that runs on into the following financial year (p2).

Theft and unauthorised use. Clauses 7.6, 7.11, 7.18 and 7.29 are recast: disconnection and seizure of material evidence with a police complaint within a stated time limit of the disconnection; the signing and service of inspection reports, with a pasting-and-photograph fallback where the consumer refuses receipt; and recovery of an assessed amount only after written notice (p2–3). Clause 8.5 addresses prevention of unauthorised reconnection and transfer of pending dues where supply is restored through another live connection (p3).

Assessment formula. Annexure IV is amended twice — the meaning of 'H' in the assessment formula is tied back to Clause 7.7 of the 2015 Code, and the table entries for agriculture (metered) and direct theft are substituted (p3).

Standard name
Electricity Supply Code
Primary topics
Theft and unauthorised use, Billing and payment, New connections and load changes

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document