GERC · Gujarat Electricity Regulatory Commission
Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Second Amendment) Regulations, 2020
AmendmentDated 16 Jan 2020Published in the Gazette 17 Jan 2020Notification No. 1 of 2020 dated 16/01/2020
Amends the Electricity Supply Code and Related Matters Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a three-page GERC amendment — Notification No. 1 of 2020, gazetted in the Gujarat Government Gazette Extraordinary (Part IV-C) on 17 January 2020 — that makes two changes to the Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2015, which it calls "the Principal Code" (p1). It comes into force from the date of gazette publication (p1).
Clause 2 substitutes Clause 4.95 of the principal Regulations, replacing the trigger-and-remedy rules for consumers whose recorded maximum demand or connected load exceeds their contract demand, contracted load or sanctioned load (p2). It separates the treatment of HT, EHT and demand-based LT connections from non-demand-based LT connections, and further separates residential from other LT categories, and unmetered agriculture connections assessed through Accucheck meter measurement. For each class it specifies how the excess is detected, what notice the licensee must give the consumer to apply for enhancement, what happens if the consumer does not respond, how the revised demand or load is computed, and the consumer's liability for charges and for the agreement terms that then apply. Non-response by unmetered agriculture consumers is routed to action under Clauses 7.31 to 7.44 (p2).
Clause 3 adds a sixth condition to Clause 8.3 of the principal Regulations, which lists the cases in which supply may be disconnected temporarily (p3). The new condition makes obstruction of access to the agreed service position — through construction around it — a disconnection ground, requires the consumer to notify the distribution licensee and shift the service position at his own cost to a mutually agreed position, and requires a notice period before disconnection (p3). The remaining clauses of 8.3 are reproduced only as blank numbered items (p3). The amendment carries no savings or transitional clause.
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.