GERC · Gujarat Electricity Regulatory Commission

Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Second Amendment) Regulations, 2020

AmendmentDated 16 Jan 2020Published in the Gazette 17 Jan 2020Notification No. 1 of 2020 dated 16/01/2020

Amends the Electricity Supply Code and Related Matters Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a three-page GERC amendment — Notification No. 1 of 2020, gazetted in the Gujarat Government Gazette Extraordinary (Part IV-C) on 17 January 2020 — that makes two changes to the Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2015, which it calls "the Principal Code" (p1). It comes into force from the date of gazette publication (p1).

Clause 2 substitutes Clause 4.95 of the principal Regulations, replacing the trigger-and-remedy rules for consumers whose recorded maximum demand or connected load exceeds their contract demand, contracted load or sanctioned load (p2). It separates the treatment of HT, EHT and demand-based LT connections from non-demand-based LT connections, and further separates residential from other LT categories, and unmetered agriculture connections assessed through Accucheck meter measurement. For each class it specifies how the excess is detected, what notice the licensee must give the consumer to apply for enhancement, what happens if the consumer does not respond, how the revised demand or load is computed, and the consumer's liability for charges and for the agreement terms that then apply. Non-response by unmetered agriculture consumers is routed to action under Clauses 7.31 to 7.44 (p2).

Clause 3 adds a sixth condition to Clause 8.3 of the principal Regulations, which lists the cases in which supply may be disconnected temporarily (p3). The new condition makes obstruction of access to the agreed service position — through construction around it — a disconnection ground, requires the consumer to notify the distribution licensee and shift the service position at his own cost to a mutually agreed position, and requires a notice period before disconnection (p3). The remaining clauses of 8.3 are reproduced only as blank numbered items (p3). The amendment carries no savings or transitional clause.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply, Agricultural supply

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document