This is a draft amendment regulation issued by the Gujarat Electricity Regulatory Commission, amending the GERC (Electricity Supply Code and Related Matters) Regulations, 2015 — the 'Principal Code'. It is the Fifth Amendment, applies to the whole of Gujarat, and takes effect from publication in the Official Gazette (p1). The document substitutes a long series of individual clauses rather than rewriting the Code.
Section 1 gives the short title, extent and commencement (p1). Section 2 updates definitions: 'Licensed Electrical Contractor' is tied to the CEA Safety Regulations 2023, and a new 'Owner' definition is inserted (p1). Section 3 requires consumers installing generating sets to coordinate with the distribution licensee and take approvals, including from the Chief Electrical Inspector (p2).
Section 4 is the largest block (pp2–7). It specifies what a demand note must contain; how excess deposits are refunded and interest charged; the completion-and-test-report process and testing of consumer installations; temporary connections; the application categories for name change, transfer to legal heir, category conversion and load change; and the licensee's written intimation on load enhancement. A key proviso lets distribution licensees release LT connections up to 150 kW without a prior test report, on the applicant's declaration under a Gujarat Government order, with the test report to follow within 45 days (p4–5).
Section 5 (pp7–9) updates installation and safety requirements for consumer wiring, transformers, switchgear, earthing and protective devices, keyed to the CEA Safety Regulations 2023, and allocates responsibility for meters and switchgear between licensee and consumer. Section 6 (pp10–13) governs metering and billing: mandatory smart/prepayment meters with a Commission exemption route, permissible meter types for LT and HT/EHT, meter-reading windows, provisional billing where meters are inaccessible, billing for defective meters, bill contents, and payment modes with a Rs 10,000 e-payment threshold and an annual rebate. Section 7 (pp13–14) prescribes service of notices on consumers; Section 8 updates the note to Annexure I Form A-1 (p14); and Section 9 replaces all references to the 2005 Standards of Performance Regulations with the 2023 Regulations (p14).
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.