Skip to content

GERC · Gujarat Electricity Regulatory Commission

Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Fifth Amendment) Regulations, 2026

Draft amendmentDated 17 Oct 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amendment regulation issued by the Gujarat Electricity Regulatory Commission, amending the GERC (Electricity Supply Code and Related Matters) Regulations, 2015 — the 'Principal Code'. It is the Fifth Amendment, applies to the whole of Gujarat, and takes effect from publication in the Official Gazette (p1). The document substitutes a long series of individual clauses rather than rewriting the Code.

Section 1 gives the short title, extent and commencement (p1). Section 2 updates definitions: 'Licensed Electrical Contractor' is tied to the CEA Safety Regulations 2023, and a new 'Owner' definition is inserted (p1). Section 3 requires consumers installing generating sets to coordinate with the distribution licensee and take approvals, including from the Chief Electrical Inspector (p2).

Section 4 is the largest block (pp2–7). It specifies what a demand note must contain; how excess deposits are refunded and interest charged; the completion-and-test-report process and testing of consumer installations; temporary connections; the application categories for name change, transfer to legal heir, category conversion and load change; and the licensee's written intimation on load enhancement. A key proviso lets distribution licensees release LT connections up to 150 kW without a prior test report, on the applicant's declaration under a Gujarat Government order, with the test report to follow within 45 days (p4–5).

Section 5 (pp7–9) updates installation and safety requirements for consumer wiring, transformers, switchgear, earthing and protective devices, keyed to the CEA Safety Regulations 2023, and allocates responsibility for meters and switchgear between licensee and consumer. Section 6 (pp10–13) governs metering and billing: mandatory smart/prepayment meters with a Commission exemption route, permissible meter types for LT and HT/EHT, meter-reading windows, provisional billing where meters are inaccessible, billing for defective meters, bill contents, and payment modes with a Rs 10,000 e-payment threshold and an annual rebate. Section 7 (pp13–14) prescribes service of notices on consumers; Section 8 updates the note to Annexure I Form A-1 (p14); and Section 9 replaces all references to the 2005 Standards of Performance Regulations with the 2023 Regulations (p14).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Metering, Billing and payment

Read with this

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document