Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft

Explanatory Note for Draft GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024

Explanatory memorandum to a draftDated 31 Aug 2024

Explanatory memorandum to the Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's explanatory note for the draft GERC (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024 (p1). It records the rationale for amending Clause 3.2 of the GERC (Electricity Supply Code and Related Matters) Regulations, 2015, the principal regulations notified on 24.09.2015 (p1).

The note says consumer organisations asked to raise the Low Tension connection threshold from 100 kVA/kW to 150 kVA/kW, and that the request went to the Electricity Supply Code Review Panel (p1). It summarises a Ministry of Power communication advising DISCOMs to give LT supply up to 150 kW to ease doing business, and cites Rule 13 of the Electricity (Rights of Consumer) Rules, 2020 on connection charges (p1). ESCRP's 26th meeting recommended amending Clause 3.2 to give LT consumers an option to increase the threshold; the Commission has deliberated and intends to amend the principal regulations (p1).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document