Skip to content

GERC · Gujarat Electricity Regulatory Commission

Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum

Explanatory Memorandum

Explanatory memorandum to a draftDated 19 Feb 2022

Explanatory memorandum to the Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the Gujarat Electricity Regulatory Commission's explanatory memorandum for the amendments it proposes to make to the GERC (Electricity Supply Code and Related Matters) Regulations, 2015, so that the Supply Code aligns with the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 and the later amendment to those Rules. It is not the amending notification itself; it narrates each GoI Rule, the existing Supply Code clause, the proposed amended clause and the Commission's rationale (p1).

Part I (pp1–74) works through 33 alignment items. It revises definitions of 'applicant', 'application', 'application form', 'disconnection' and 'occupier', and shifts approval of application forms and formats from the distribution licensee to the Commission (pp2–6). It requires licensees to display connection procedures in Gujarati and English, provide online application and tracking facilities, and establish a centralised 24/7 toll-free call centre, a CRM system and door-step services for senior citizens (pp6–12, pp63–69). It specifies documents for new connections up to 10 kW, ties connection and load-release timelines to the GERC Standard of Performance Regulations, and mandates smart pre-payment or pre-payment meters with Commission-approved exceptions (pp20–29). Metering items cover reading frequency, consumer-submitted meter photographs, testing fees, third-party testing and CGRF appeal (pp32–44). Billing items cover tariff display and advance notice of FPPPA changes, bill delivery modes and timing, first-bill and provisional-bill limits, a rebate for delayed bills, mandatory e-payment above Rs 1,000 with a rebate, and receipts (pp45–55). Further items cover advance fixed charges during absence, final bill and security deposit refund, pre-payment auto cut-off, 24x7 supply, outage intimation via SMS or electronic mode, and consumer-awareness measures (pp55–74).

Part II (pp75–78) adds three amendments: bill meter status shown as 'visual inspection'; refund of excess demand-note amount within 30 days of energisation, with interest at the Late Payment Surcharge rate if delayed; and a 3-minute integration option in the definition of maximum demand (pp75–78). The memorandum repeatedly leaves implementation details to future Commission specifications, the SoP Regulations and tariff orders, and no Gazette date or notification number is printed in the text.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document