Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
Explanatory Memorandum
Explanatory memorandum to a draftDated 19 Feb 2022
Draft
The draft has since been finalised as the Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023.
Explanatory memorandum to the Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the Gujarat Electricity Regulatory Commission's explanatory memorandum for the amendments it proposes to make to the GERC (Electricity Supply Code and Related Matters) Regulations, 2015, so that the Supply Code aligns with the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 and the later amendment to those Rules. It is not the amending notification itself; it narrates each GoI Rule, the existing Supply Code clause, the proposed amended clause and the Commission's rationale (p1).
Part I (pp1–74) works through 33 alignment items. It revises definitions of 'applicant', 'application', 'application form', 'disconnection' and 'occupier', and shifts approval of application forms and formats from the distribution licensee to the Commission (pp2–6). It requires licensees to display connection procedures in Gujarati and English, provide online application and tracking facilities, and establish a centralised 24/7 toll-free call centre, a CRM system and door-step services for senior citizens (pp6–12, pp63–69). It specifies documents for new connections up to 10 kW, ties connection and load-release timelines to the GERC Standard of Performance Regulations, and mandates smart pre-payment or pre-payment meters with Commission-approved exceptions (pp20–29). Metering items cover reading frequency, consumer-submitted meter photographs, testing fees, third-party testing and CGRF appeal (pp32–44). Billing items cover tariff display and advance notice of FPPPA changes, bill delivery modes and timing, first-bill and provisional-bill limits, a rebate for delayed bills, mandatory e-payment above Rs 1,000 with a rebate, and receipts (pp45–55). Further items cover advance fixed charges during absence, final bill and security deposit refund, pre-payment auto cut-off, 24x7 supply, outage intimation via SMS or electronic mode, and consumer-awareness measures (pp55–74).
Part II (pp75–78) adds three amendments: bill meter status shown as 'visual inspection'; refund of excess demand-note amount within 30 days of energisation, with interest at the Late Payment Surcharge rate if delayed; and a 3-minute integration option in the definition of maximum demand (pp75–78). The memorandum repeatedly leaves implementation details to future Commission specifications, the SoP Regulations and tariff orders, and no Gazette date or notification number is printed in the text.
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.