Skip to content

GERC · Gujarat Electricity Regulatory Commission

Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Third Amendment) Regulations, 2023

AmendmentDated 5 Dec 2023Published in the Gazette 6 Dec 2023NOTIFICATION NO. 01 OF 2023 dated 05/12/2023

Amends the Electricity Supply Code and Related Matters Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Third Amendment to the GERC (Electricity Supply Code and Related Matters) Regulations, 2015 (the "Principal Code"), notified as Notification No. 01 of 2023 and published in the Gujarat Government Gazette (Extraordinary, Part IV-C) on 6 December 2023 (p1). Clause 1 gives it its short title and says it comes into force from the date of publication in the Official Gazette (p1–2). It is a clause-by-clause rewrite: it does not restate the principal Code, it substitutes or inserts individual clauses.

Pages 2–6 carry the operational centre of gravity — Section 4, on applying for and processing new connections and other services. It deletes the old applicability paragraph and restates who the Code binds (p2); substitutes six Section 2 definitions (Applicant, Application, Application Form, Disconnection, Maximum Demand, Occupier) (p2); and then rewrites the application-handling clauses: website display of application status, procedures and document lists; free availability of forms and online/app channels; document requirements, with a simplified two-document route for connections up to 10 kW (p3); spot scrutiny of hard-copy applications and generation of registration numbers; a permanent application register/database; the routing of HT/EHT applications through the transmission licensee with feasibility timelines; refunds of excess amounts and excess-expenditure recovery; and the commissioning/test-report procedure, including Electrical Inspector approval above 440 V (p3–5). Later clauses in this block cover release of additional load and permitted payment modes (p5–6).

Pages 6–11 rewrite Section 6 on metering and billing: the default requirement of smart pre-payment or pre-payment meters (with a route to seek a Commission exemption), consumer choice to buy the meter, meter-type prescriptions by consumer class, installation and reading practice, third-party meter testing and who bears the cost of defective or burnt meters, provisional billing where meters are inaccessible, bill content, delivery and dispatch timelines, and payment modes with a rebate for e-payment. Pages 11–12 amend Section 8 (auto cut-off on pre-payment meters treated as not a disconnection; final-bill disconnection and security-deposit refund) and Section 9 (consumer-awareness measures such as publishing standards of performance and compensation, and the 24x7 supply obligation with its exclusions and notice duties).

The document closes with the Secretary's signature block dated 05/12/2023 (p12). Note that a heading for "Modification in Clause 6.76" appears with no operative text at the page break (p10–11).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Metering, Billing and payment

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗