Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Second Amendment) Regulations, 2019

Draft amendmentDated 24 Nov 2019

Draft

A proposal that has since been finalised as the Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short draft amendment from the Gujarat Electricity Regulatory Commission that would change three provisions of the GERC (Electricity Supply Code and Related Matters) Regulations, 2015 — referred to throughout as the "principal Code". It is signed at Gandhinagar on 25/11/2019 and would come into force from the date of publication in the Official Gazette, a date the document does not give (p1).

Section 1 sets the short title and commencement. Section 2 substitutes clause 4.95 in full (p1–2), governing what happens when a consumer's actual demand or load exceeds the contracted or sanctioned figure. It separates three situations: HT, EHT and demand-based LT connections, where maximum demand recorded above contract demand repeatedly during a financial year triggers a notice to the consumer and, if the consumer does not respond, enhancement of contract demand to an average of the recorded maxima; non-demand-based LT connections, where an annual review of connected load against contracted/sanctioned load triggers a longer notice and enhancement to the load found at inspection, with different trigger thresholds for residential and other consumers; and unmetered agricultural connections, where connected load is assessed from Accucheck meter measurements and a load-enhancement estimate is issued for payment, with non-payment referred to the principal Code's enforcement clauses. In each case the consumer pays applicable charges and the enhanced figure becomes the revised contract demand or load.

Section 3 substitutes clause 6.50 (p2) on spot billing, requiring the bill distributor's name to be rubber-stamped and the delivery date written on the bill before handover.

Section 4 adds a sixth condition to clause 8.3 on temporary disconnection (p2–3): the consumer must not build around the existing service position so as to block agreed access, must shift the service position at his own cost if construction makes it necessary, and faces disconnection after a seven-day notice for non-compliance.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Billing and payment, Agricultural supply

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document