GERC · Gujarat Electricity Regulatory Commission
Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Second Amendment) Regulations, 2019
Draft amendmentDated 24 Nov 2019
Draft
A proposal that has since been finalised as the Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short draft amendment from the Gujarat Electricity Regulatory Commission that would change three provisions of the GERC (Electricity Supply Code and Related Matters) Regulations, 2015 — referred to throughout as the "principal Code". It is signed at Gandhinagar on 25/11/2019 and would come into force from the date of publication in the Official Gazette, a date the document does not give (p1).
Section 1 sets the short title and commencement. Section 2 substitutes clause 4.95 in full (p1–2), governing what happens when a consumer's actual demand or load exceeds the contracted or sanctioned figure. It separates three situations: HT, EHT and demand-based LT connections, where maximum demand recorded above contract demand repeatedly during a financial year triggers a notice to the consumer and, if the consumer does not respond, enhancement of contract demand to an average of the recorded maxima; non-demand-based LT connections, where an annual review of connected load against contracted/sanctioned load triggers a longer notice and enhancement to the load found at inspection, with different trigger thresholds for residential and other consumers; and unmetered agricultural connections, where connected load is assessed from Accucheck meter measurements and a load-enhancement estimate is issued for payment, with non-payment referred to the principal Code's enforcement clauses. In each case the consumer pays applicable charges and the enhanced figure becomes the revised contract demand or load.
Section 3 substitutes clause 6.50 (p2) on spot billing, requiring the bill distributor's name to be rubber-stamped and the delivery date written on the bill before handover.
Section 4 adds a sixth condition to clause 8.3 on temporary disconnection (p2–3): the consumer must not build around the existing service position so as to block agreed access, must shift the service position at his own cost if construction makes it necessary, and faces disconnection after a seven-day notice for non-compliance.
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
- Dated 24 Nov 2019Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.