Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Second Amendment) Regulations, 2017

Draft amendmentDated 2 Aug 2017

Draft

A proposal that has since been finalised as the Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's draft second amendment to the Electricity Supply Code, signed at Gandhinagar on 2 August 2017 and made under s.181(2)(x) read with s.50 of the Electricity Act 2003 and s.42(1)(b) of the Gujarat Electricity Industry (Reorganisation and Regulation) Act 2003. It does only two things, both of them substitutions (p1).

Clause 2 replaces the disconnection-notice clause of the Code as it stood after the First Amendment of 2016. The substituted clause deals with a consumer who defaults on dues: a written disconnection notice under s.56 of the Electricity Act giving a stated notice period, which may be embedded in the energy bill; the consequences of a dishonoured cheque, including a duty on the licensee to inform the consumer and a short window to pay by cash, online portal, pay order or RTGS/NEFT; liability for late payment surcharge and a cheque-dishonour charge; and a restriction confining a consumer with one cheque dishonour in a financial year to specified payment modes until the end of the following financial year (p1–2).

Clause 3 replaces clause 8.3(1), on temporary disconnection for non-payment of the licensee's dues. It provides for a written notice under s.56, embeddable in the energy bill, and for disconnection on expiry of the notice period by removing the service line or meter as the licensee thinks fit (p2).

The regulations take effect from gazette publication; the gazette date is not printed, and the notification number is left blank. Although clause 1 is headed "Short Title, Extent and Commencement", no extent is stated. There is no explanatory memorandum, objection period or saving clause, and the two substituted clauses describe the notice period in different day-counting language, which is the main drafting issue a commenter would raise.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Billing and payment

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document