Skip to content

GERC · Gujarat Electricity Regulatory Commission

Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft

Explanatory Note for Draft GERC (Electricity Supply Code and Related Matters) (Second Amendment) Regulations, 2019

Explanatory memorandum to a draftDated 24 Nov 2019

Explanatory memorandum to the Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's explanatory note — a statement of reasons — for the draft second amendment to the GERC (Electricity Supply Code and Related Matters) Regulations, 2015. It explains why the Commission proposes to change the Supply Code and where the proposals came from: the Electricity Supply Code Review Panel (ESCRP), constituted under the principal regulations, deliberated on requests from distribution licensees, consumers and consumer organisations and sent its recommendations to the Commission, which accepted them (p1).

Three changes are described. The first concerns agricultural connections: because farmers' excess drawal is treated as unintentional and a farmer has no easy way to compare connected load with contracted load, unmetered agricultural consumers whose connected load is found to be 10% or more above contracted load would be given 30 days to enhance load (p1). The second narrows Clause 6.50 so that the bill distributor's name-stamp and hand-written delivery date on the bill are required only where spot billing is carried out (p1). The third adds a condition to the grounds on which supply may be disconnected temporarily: the consumer must not construct around the existing service position so as to block the access already agreed, and must notify the licensee and get the service position shifted at his own cost, to a mutually agreed position, if remodelling makes it necessary (p1–2).

Standard name
Electricity Supply Code
Primary topics
Agricultural supply, Conditions of supply, Billing and payment

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document