GERC · Gujarat Electricity Regulatory Commission
Electricity Supply Code and Related Matters Regulations, 2015 — Second Amendment, 2019 — Explanatory Note — Draft
Explanatory Note for Draft GERC (Electricity Supply Code and Related Matters) (Second Amendment) Regulations, 2019
Explanatory memorandum to a draftDated 24 Nov 2019
Draft
The draft has since been finalised as the Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020.
Explanatory memorandum to the Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's explanatory note — a statement of reasons — for the draft second amendment to the GERC (Electricity Supply Code and Related Matters) Regulations, 2015. It explains why the Commission proposes to change the Supply Code and where the proposals came from: the Electricity Supply Code Review Panel (ESCRP), constituted under the principal regulations, deliberated on requests from distribution licensees, consumers and consumer organisations and sent its recommendations to the Commission, which accepted them (p1).
Three changes are described. The first concerns agricultural connections: because farmers' excess drawal is treated as unintentional and a farmer has no easy way to compare connected load with contracted load, unmetered agricultural consumers whose connected load is found to be 10% or more above contracted load would be given 30 days to enhance load (p1). The second narrows Clause 6.50 so that the bill distributor's name-stamp and hand-written delivery date on the bill are required only where spot billing is carried out (p1). The third adds a condition to the grounds on which supply may be disconnected temporarily: the consumer must not construct around the existing service position so as to block the access already agreed, and must notify the licensee and get the service position shifted at his own cost, to a mutually agreed position, if remodelling makes it necessary (p1–2).
Read with this
The regulation
- Dated 21 Sep 2015Electricity Supply Code and Related Matters Regulations, 2015
Amendments and corrections
- Dated 22 Nov 2016Electricity Supply Code and Related Matters Regulations, 2015 — First Amendment, 2016
- Dated 16 Jan 2020Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Electricity Supply Code and Related Matters, 2015 — Third Amendment Regulations, 2023
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum, 2024
- Dated 1 Jan 2024Electricity Supply Code and Related Matters (Third Amendment) Regulations, 2023 — Corrigendum
- Dated 23 Sep 2024Electricity Supply Code and Related Matters Regulations, 2015 — Fourth Amendment, 2024
Commencement notices and reasons
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
- Dated 17 Oct 2026Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Draft
- Dated 17 Oct 2026Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Fifth Amendment, 2026 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 11 Nov 2014Draft Gujarat Electricity Supply Code and Related Matters, 2014
- Dated 28 Sep 2016Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft
- Dated 28 Sep 2016Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Dated 2 Aug 2017Electricity Supply Code and Related Matters, 2015 — Second Amendment, 2017 — Draft
- Dated 24 Nov 2019Electricity Supply Code and Related Matters (Second Amendment) Regulations, 2019 — Draft
- Dated 19 Feb 2022Electricity Supply Code and Related Matters Regulations, 2015 — Third Amendment, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Electricity Supply Code and Related Matters Regulations, 2015 — Draft Amendments — Explanatory Memorandum
- Dated 31 Aug 2024Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Explanatory Note — Draft
6 more documents belong here and are not on Voltaic: 6 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.