Electricity Supply Code and Related Matters (First Amendment) Regulations, 2016 — Draft

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (First Amendment) Regulations, 2016

Draft amendmentDated 28 Sep 2016Notification No. …. of 2016

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amendment by the Gujarat Electricity Regulatory Commission to its 2015 Electricity Supply Code. It is short and targeted: a set of substitutions to specific clauses of the principal Code, not a fresh supply code. It would commence from the date of publication in the official gazette; no gazette date is printed (p1).

Page 1 contains the short title and commencement clause and replaces clause 4.16, which lists the documents a licensee may accept as proof of ownership or occupancy, including agricultural land records, municipal tax demand, allotment letter, and an ownership certificate from a village-level government functionary (p1).

Pages 1–2 amend Section 6. Clause 6.76 requires sufficient bill collection centres and, where necessary, a priority collection window for senior citizens, physically challenged persons and women. Clause 6.77 sets the procedure for disconnection of defaulting consumers, the notice period, payment after cheque dishonour, late payment surcharge, a cheque dishonour charge, and a bar on non-cash payment modes after a cheque dishonour (pp1–2).

Page 2 amends Section 7. Clause 7.6 covers disconnection, seizure of material evidence and a police complaint for theft. Clause 7.11 covers signing and handing over the inspection report and alternative service if the consumer refuses. Clause 7.18 covers recovery of the assessed amount after notice (p2).

Page 3 amends clause 8.5 on preventing unauthorized reconnection and on transferring pending dues to another live connection, and substitutes Sr. Nos. 7 and 11 of the Annexure IV table relating to usage load factors for agricultural consumers and direct theft categories (p3).

Standard name
Electricity Supply Code
Primary topics
Billing and payment, Theft and unauthorised use, New connections and load changes

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document