Skip to content

GERC · Gujarat Electricity Regulatory Commission

Electricity Supply Code and Related Matters, 2015 — Fourth Amendment, 2024 — Draft

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) (Fourth Amendment) Regulations, 2024

Draft amendmentDated 31 Aug 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's draft Fourth Amendment to its 2015 Electricity Supply Code, signed at Gandhinagar on 31/08/2024 (p2). Clause 1 sets the short title and provides that the amendment comes into force from the date of publication in the Official Gazette (p1). Clause 2 substitutes clause 3.2 of the Principal Code, restating the rated voltage of AC supply against bands of contracted load and contracted demand — single phase, three phase at 400 V, and 11 kV / 22 kV for the highest band (p1–2). It also allows a consumer to opt for a higher voltage of supply than its load band would otherwise require, and directs the licensee to make a commercially viable offer to existing consumers who cross a threshold because of additional load, weighing reduction in transmission and distribution losses and loading on the licensee's transformers; supply already being given at a lower voltage is to continue (p2). Clause 3 amends Annexure I, Form A-1, Point 7 (Load Detail), widening the three-phase load band where the applicant or consumer opts for it (p2).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes

Read with this

Consolidated copies, for reference (1)

6 more documents belong here and are not on Voltaic: 6 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document