CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2024

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2024

AmendmentDated 17 Dec 2024In force from 23 Dec 2024No. L-1/260/2021/CERC dated 17

Amends the Deviation Settlement Mechanism and Related Matters Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page CERC amendment to the Deviation Settlement Mechanism and Related Matters Regulations, 2024, issued on 17 December 2024 and expressed to take effect from 23.12.2024 (p1). It does not restate the parent regulation; it inserts words into three definitions and replaces one charging clause.

Clause 1 supplies the short title and commencement (p1). Clause 2 amends Regulation 3(1) of the Principal Regulations in three places: the generating-capability wording in sub-clause (g) is qualified so that capability is limited to the quantum of connectivity granted; sub-clause (j) is widened to cover a WS seller, MSW seller or similar entity selling power through open access to a third party, alongside renewable-based captive consumption; and sub-clause (y) is widened to cover a general seller selling through open access, alongside non-renewable captive consumption (p1–2).

Clause 3 substitutes Regulation 8(8), the infirm-power charging provision: charges for injection of infirm power are zero, but infirm power scheduled after a successful Grid Code trial run is charged at the rate applicable to a general seller or WS seller, and over-injection of scheduled infirm power is charged at zero when system frequency exceeds 50.05 Hz (p2). A closing note records where the Principal Regulations were gazetted (p2).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Open access, Connectivity and GNA

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document