Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025

AmendmentDated 25 Jun 2025In force from 1 Jul 2025No. L-1/260/2021/CERC dated 25.06.2025

Amends the Deviation Settlement Mechanism and Related Matters Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page CERC notification (No. L-1/260/2021/CERC, dated 25.06.2025) making the second set of changes to the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024 — the instrument governing what a generator pays or is paid when its actual injection departs from schedule (p1).

Section 1 gives the short title, CERC (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025, and states that the amendment comes into force with effect from 01.07.2025 — a fixed prospective date, not the date of the notification (p1).

Section 2 substitutes clause (8) of Regulation 8 of the Principal Regulations in full, replacing the treatment of charges for injection of infirm power with a self-contained four-part provision (p1–2). The default is that charges for injection of infirm power are zero, with two carve-outs. For thermal generating stations, infirm power injected from the date of first synchronization of the unit until the trial run is successfully completed is paid at the normal rate of charges for deviations for each time block, subject to a ceiling of ₹ 2.86/kWh (p2). Where infirm power is scheduled after a successful trial run as specified in the Grid Code, deviation over the scheduled infirm power is charged as applicable to a general seller or a WS seller, as the case may be (p2). Finally, as a notwithstanding override on both carve-outs, whenever system frequency exceeds 50.05 Hz, charges for injection of infirm power — and for over-injection beyond scheduled infirm power after a successful trial run — are zero (p2).

The closing Note records the Gazette particulars of the Principal Regulations (21.08.2024) and of the First Amendment Regulations (24.12.2024), letting an analyst trace the amendment chain (p2).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document