Deviation Settlement and Related Matters (Second Amendment) Regulations, 2025 — Statement of Reasons

Central Electricity Regulatory Commission (Deviation Settlement and Related Matters) (Second Amendment) Regulations, 2025 – Statement of Objects & Reasons (SOR) thereof.

Statement of reasonsDated 14 Nov 2025No. L-1/260/2021/CERC

The commission's reasons for the Deviation Settlement Mechanism and Related Matters Regulations, 2024 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons for the Second Amendment to its Deviation Settlement and Related Matters (DSM) Regulations, 2024, signed by the Chairperson and Members and issued on 14 November 2025 (p1, p9). It is the consultation record and reasoning behind the amendment, not the amendment text itself.

Pages 1–2 set the background: the principal DSM Regulations 2024 were notified on 5 August 2024 and took effect on 16 September 2024, and a First Amendment effective 23 December 2024 changed, among other things, the treatment of infirm power. Thermal generators complained of being unable to recover fuel costs incurred up to trial run, and the Ministry of Power wrote on 27 March 2025 asking the Commission to examine fuel cost recovery during trial runs for generators not covered by s.62. A Draft Second Amendment and an Explanatory Memorandum followed; comments were invited up to 10 June 2025, nineteen stakeholders responded, and a public hearing was held (p2, pp10–11).

Section 2 (p3) deals with commencement. The draft proposed that the regulations take effect from 1 July 2025; generators asked that this be backdated to 23 December 2024 or that retrospective claims be allowed. The Commission refused, holding that s.178 of the Act does not empower it to make retrospective regulations, and retained the draft date.

Section 3 (pp3–7) is the operative core: the amendment to Regulation 8, which fixes what is payable for injection of infirm power — a zero-charge default, an exception for thermal stations from first synchronisation to successful trial run paid at the normal deviation rate subject to a ceiling, treatment of post-trial-run injections by the applicable seller category, and a zero-charge rule tied to high system frequency. The Commission explains why it chose a capped mean-rate approach instead of actual fuel-cost recovery, declines to extend the benefit beyond thermal stations, and confirms that injection after trial run but before COD follows the seller's applicable category.

Section 4 (pp7–9) records further stakeholder suggestions — PSP available capacity, WS seller pooling and the QCA/lead generator model, ramping and minimum turn-down level deviations, reference rate for PSP, trial run for green hydrogen, hydro during high-inflow season, and the contract/reference rate definitions for green markets — all held to be beyond the scope of this amendment. Annexures I, II and IIA list the commenting stakeholders, the public hearing presenters and the participants (pp10–11).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.