Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2024 — Draft

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2024

Draft amendmentDated 2 Oct 2024L-1/260/2021/CERC

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's draft First Amendment to the CERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2024 — the instrument governing charges when actual injection or drawal departs from schedule. It is issued from New Delhi under Section 178 of the Electricity Act, 2003, states that previous publication has been done, and is to take effect from 01.12.2024 (p1). The Note records that the Principal Regulations were published in the Gazette of India (Extraordinary) on 21.08.2024 (p2).

The draft makes three changes. Clause 2 amends three definitions in Regulation 3(1): the description of a unit's generating capability in a given time block is capped at the quantum of connectivity granted (p1); and the seller definitions at sub-clauses (j) and (y) are widened by inserting wording covering a WS seller or MSW seller, and a general seller, selling power through open access to a third party, placed ahead of the existing captive-consumption wording (p1–2).

Clause 3 substitutes Regulation 8(8) in full (p2). The replacement keeps deviation charges for injection of infirm power at zero, but adds two provisos: where infirm power is scheduled after a trial run as specified in the Grid Code, deviation charges over the scheduled infirm power follow the rates for a general seller or WS seller; and over-injection of scheduled infirm power attracts zero deviation charges when system frequency exceeds 50.05 Hz.

Only the amendment clauses, the Secretary's signature and the Gazette Note appear; no statement of reasons, explanatory memorandum or comment deadline is included (p1–2).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document