CERC · Central Electricity Regulatory Commission

Draft DSM Regulations, 2024 — Explanatory Memorandum

Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

Explanatory memorandum to a draftDated 30 Apr 2024

Draft

The draft has since been finalised as the Deviation Settlement Mechanism and Related Matters Regulations, 2024.

Explanatory memorandum to the Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Explanatory Memorandum accompanying the Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024, notified on April 30, 2024 (p5). It explains why the Commission proposes to replace the framework in the DSM Regulations, 2022 (notified 14 March 2022, in force from 5 December 2022) and sets out the Expert Committee's recommendations and the Commission's proposed design choices (p2–5).

Section 1 recounts operational experience after the 2022 regulations: frequency excursions, inadequate primary and secondary response, and State behaviour of under-drawal in high frequency and over-drawal in low frequency, leading to interim suo motu orders in Petition No. 16/SM/2022 and Petition No. 01/SM/2023 (p2–3). Section 2 records the Expert Committee's diagnosis of asymmetric DSM pricing and over-incentivisation of deviation, and its design principles: graded charges within the operative band, flat charges outside, and volume limits to encourage ancillary services participation (p3–5).

Section 3 discusses the Normal Rate of Charge for Deviation, reproduces the Expert Committee's two alternatives, and states that the Commission adopted the second alternative with equal weightage to Integrated Day-Ahead Market, Real Time Market and ancillary service charges (p5–7). Section 4 sets out proposed deviation charges for general sellers, run-of-river stations, municipal-solid-waste stations and wind/solar/hybrid WS sellers, including volume limits and frequency linkage (p7–19). Section 5 proposes treatment of standalone and co-located energy storage systems, including separate scheduling of WS and ESS components through a lead generator or QCA (p19–21). Section 6 proposes buyer deviation charges, buyer volume limits, RE-rich and Super RE-rich State categorisation, and miscellaneous treatments for infirm power, start-up power, forced outage, multiple contracts, inter-regional and cross-border transactions, and net-injecting States (p21–30). Section 7 proposes a Grid Security Charge to recover deficits in the Deviation and Ancillary Service Pool Account, with a transitional allocation method until 31.03.2025 and a reserve-shortfall-based method from 01.04.2025 (p30–33).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Ancillary services and reserves, Energy storage deployment

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document