Draft DSM Regulations, 2024 — Explanatory Memorandum
Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024
Explanatory memorandum to a draftDated 30 Apr 2024
Draft
The draft has since been finalised as the Deviation Settlement Mechanism and Related Matters Regulations, 2024.
Explanatory memorandum to the Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Explanatory Memorandum accompanying the Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024, notified on April 30, 2024 (p5). It explains why the Commission proposes to replace the framework in the DSM Regulations, 2022 (notified 14 March 2022, in force from 5 December 2022) and sets out the Expert Committee's recommendations and the Commission's proposed design choices (p2–5).
Section 1 recounts operational experience after the 2022 regulations: frequency excursions, inadequate primary and secondary response, and State behaviour of under-drawal in high frequency and over-drawal in low frequency, leading to interim suo motu orders in Petition No. 16/SM/2022 and Petition No. 01/SM/2023 (p2–3). Section 2 records the Expert Committee's diagnosis of asymmetric DSM pricing and over-incentivisation of deviation, and its design principles: graded charges within the operative band, flat charges outside, and volume limits to encourage ancillary services participation (p3–5).
Section 3 discusses the Normal Rate of Charge for Deviation, reproduces the Expert Committee's two alternatives, and states that the Commission adopted the second alternative with equal weightage to Integrated Day-Ahead Market, Real Time Market and ancillary service charges (p5–7). Section 4 sets out proposed deviation charges for general sellers, run-of-river stations, municipal-solid-waste stations and wind/solar/hybrid WS sellers, including volume limits and frequency linkage (p7–19). Section 5 proposes treatment of standalone and co-located energy storage systems, including separate scheduling of WS and ESS components through a lead generator or QCA (p19–21). Section 6 proposes buyer deviation charges, buyer volume limits, RE-rich and Super RE-rich State categorisation, and miscellaneous treatments for infirm power, start-up power, forced outage, multiple contracts, inter-regional and cross-border transactions, and net-injecting States (p21–30). Section 7 proposes a Grid Security Charge to recover deficits in the Deviation and Ancillary Service Pool Account, with a transitional allocation method until 31.03.2025 and a reserve-shortfall-based method from 01.04.2025 (p30–33).
Read with this
The regulation
Amendments and corrections
- Dated 18 Nov 2024Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Errata
- Dated 17 Dec 2024Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2024
- Dated 25 Jun 2025Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025
- Dated 25 Aug 2026Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Third Amendment, 2026
Commencement notices and reasons
- Dated 27 Aug 2024Gazette No. 712 — effective date 16.09.2024
- Dated 15 Sep 2024DSM Regulations, 2024 — Commencement Notification (partial modification)
- Dated 16 Sep 2024DSM Regulations, 2024 — Commencement Notification, 16.09.2024
- Dated 16 Sep 2024Deviation Settlement Mechanism and Related Matters Regulations, 2024 — commencement notification, 16.09.2024
- Dated 22 Oct 2024DSM Regulations, 2024 — Notification of effective date 01.12.2024 for Clause 8 of Regulation 8
- Dated 22 Oct 2024DSM Regulations, 2024 — Clause 8 of Regulation 8 commencement notification
- Dated 15 Nov 2024Deviation Settlement and Related Matters Regulations, 2024 — Statement of Reasons
- Dated 29 Nov 2024DSM Regulations, 2024 — Clause 8 of Regulation 8 commencement notification, effective 23.12.2024
- Dated 17 Dec 2024Deviation Settlement and Related Matters (First Amendment) Regulations, 2024 — Statement of Reasons
- Dated 23 Dec 2024DSM Regulations, 2024 — commencement of Clause 8 of Regulation 8, effective 23.12.2024
- Dated 14 Nov 2025Deviation Settlement and Related Matters (Second Amendment) Regulations, 2025 — Statement of Reasons
- Dated 25 Aug 2026Deviation Settlement and Related Matters (Third Amendment) Regulations, 2026 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (4)
- Dated 5 Aug 2024Deviation Settlement Mechanism and Related Matters Regulations, 2024
- Dated 17 Dec 2024Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2024
- Dated 25 Jun 2025Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025
- Dated 25 Aug 2026Deviation Settlement Mechanism and Related Matters (Third Amendment) Regulations, 2026
Earlier drafts
- Dated 30 Apr 2024Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Draft
- Dated 30 Apr 2024Public notice: Draft Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Public Notice
- Dated 24 May 2024Notice extending the date for comments: Draft Deviation Settlement Mechanism and Related Matters Regulations, 2024 — comment deadline extension notice
- Dated 4 Jun 2024Hearing notice: Draft Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Public Hearing Notice, 20.06.2024
- Dated 13 Jun 2024Hearing notice: Revised public hearing notice (19.06.2024) — draft DSM Regulations, 2024
- Dated 2 Oct 2024Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2024 — Draft
- Dated 2 Oct 2024Public notice: Draft Deviation Settlement Mechanism (First Amendment) Regulations, 2024 — Public Notice
- Dated 2 Oct 2024Explanatory memorandum: Deviation Settlement Mechanism (First Amendment) Regulations, 2024 — Explanatory Memorandum — Draft
- Dated 22 Oct 2024Hearing notice: Draft Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2024 — Public Hearing Notice (04.11.2024)
- Dated 10 May 2025Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025 — Draft
- Dated 10 May 2025Public notice: Deviation Settlement Mechanism (Second Amendment) Regulations, 2025 — Public Notice — Draft
- Dated 10 May 2025Explanatory memorandum: Draft Deviation Settlement Mechanism (Second Amendment) Regulations, 2025 — Explanatory Memorandum
- Dated 11 Jun 2025Hearing notice: Public hearing notice on Draft Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025
- Dated 26 May 2026Deviation Settlement Mechanism and Related Matters (Third Amendment) Regulations, 2026 — Draft
- Dated 26 May 2026Public notice: Draft Deviation Settlement Mechanism and Related Matters (Third Amendment) Regulations, 2026 — Public Notice
- Dated 16 Jun 2026Explanatory memorandum: Deviation Settlement Mechanism (Third Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 17 Jun 2026Hearing notice: Public hearing notice on Draft Deviation Settlement Mechanism (Third Amendment) Regulations, 2026
9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.