Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2024

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2024

Amendment · Gazette copyDated 17 Dec 2024Published in the Gazette 24 Dec 2024In force from 23 Dec 2024F. No. L-1/260/2021/CERC. dated the 17th December, 2024

The Gazette copy of the Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A three-page Gazette amendment by the Central Electricity Regulatory Commission to its Deviation Settlement Mechanism (DSM) Regulations, 2024 — the Principal Regulations notified in the Gazette of India, Part III, Section 4, No. 642, dated 21.08.2024 (p3, Note). The Hindi and English texts sit side by side, and the instrument is signed by the Secretary under file number F. No. L-1/260/2021/CERC (p1–3).

Regulation 1 gives the short title and fixes commencement with effect from 23.12.2024 — one day before the gazette date printed on the document itself (p2). Regulation 2 makes three insertions into the definitions in Regulation 3(1) of the Principal Regulations: it caps an entity's generating capability at the quantum of connectivity granted, and it brings WS sellers, MSW sellers and general sellers who sell power through open access to a third party into the seller sub-clauses used for captive consumption (p2). Regulation 3 substitutes Regulation 8(8) on infirm power: charges for injecting infirm power are zero, with one proviso applying general-seller or WS-seller deviation charges once infirm power is scheduled after a successful trial run under the Grid Code, and a second proviso making over-injection deviation charges zero above a stated system frequency (p3).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (3)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.