Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025

Amendment · Gazette copyDated 25 Jun 2025Published in the Gazette 2 Jul 2025In force from 1 Jul 2025No. L-1/260/2021/CERC.— dated 25th June, 2025

The Gazette copy of the Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-clause CERC amendment to its 2024 Deviation Settlement Mechanism regulations, notified on 25 June 2025, brought into force from 1 July 2025 and published in the Gazette on 2 July 2025 (p1–2). Regulation 1 supplies the short title and commencement (p2). Regulation 2 substitutes clause (8) of Regulation 8 of the Principal Regulations, which deals with charges for injection of infirm power (p2–3).

The substituted clause makes zero the default charge for injecting infirm power, then carves out two situations. For thermal generating stations, infirm power injected from first synchronization of the unit until successful completion of the trial run is paid at the Normal Rate of Charges for Deviations for each time block, subject to a ceiling of ₹2.86/kWh (p2–3). Where infirm power is scheduled after a successful trial run as specified in the Grid Code, deviation over the scheduled infirm power attracts the charges applicable to a general seller or WS seller, as the case may be (p3). A closing sub-clause provides that when system frequency exceeds 50.05 Hz, charges for injection of infirm power, or for over-injection beyond schedule after a successful trial run by such a seller, are zero (p3).

Nothing else in the Principal Regulations is touched. A Note records the gazette references for the Principal Regulations and for the First Amendment (p3).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (3)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.