Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters Regulations, 2024

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

Regulation · Gazette copyDated 5 Aug 2024Published in the Gazette 21 Aug 2024No. L-1/260/2021/CERC dated 5th August, 2024

The Gazette copy of the Deviation Settlement Mechanism and Related Matters Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024 are a principal CERC regulation, signed on 5 August 2024 (p11) and published in the Gazette of India (Extraordinary) on 21 August 2024 (p1). They replace the 2022 DSM regulations, which are repealed from the date these regulations commence (p19). Commencement itself is deferred: they take effect on a date the Commission is to notify separately (p11), so no operative date is fixed by the text.

The preamble and Regulations 1–3 (pp11–12) state the objective — a commercial mechanism to make grid users adhere to their schedules for grid security and stability — and define the actors and price references the rest of the regulation turns on: WS sellers (wind, solar or wind-solar hybrid, with or without storage), general sellers, MSW sellers, run-of-river hydro, buyers, regional entities, QCAs, and the State categories of RE-rich (combined solar and wind capacity of 1000 MW or more but less than 5000 MW) and RE Super-rich (5000 MW or more) (p12).

Regulations 4–7 (p13) say who is covered — all grid-connected regional entities and other entities engaged in inter-State purchase and sale — impose adherence to schedule, give the deviation computation for general sellers, WS sellers and buyers, and derive the Normal Rate of deviation charges from power-exchange day-ahead and real-time prices plus ancillary service cost.

Regulation 8 (pp14–17) is the operative core: receivable/payable charge tables and volume-limit bands for general sellers (frequency-linked, with separate treatment for RoR and MSW stations), WS sellers (frequency-independent, with bands that tighten from 1 April 2026), standalone storage and storage co-located with RE, and buyers; plus special cases — infirm power, start-up and auxiliary power, forced outage, HP-DAM sellers, inter-regional and cross-border deviation, and States with net injection treated as buyers (pp17–18).

The accounting provisions (pp18–19) set the weekly RLDC-to-RPC data and statement cycle, the credits and debits of the Deviation and Ancillary Service Pool Account, cross-regional deficit sharing and recovery from drawee DICs, followed by payment deadlines, late payment surcharge and letters of credit (Reg 9), the Commission's powers to relax provisions and issue practice directions, and repeal and savings (Reg 12) (p19).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Power markets and exchanges

Read with this

Other copies of these documents (3)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document