Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025 — Draft

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (Second Amendment) Regulations, 2025

Draft amendmentDated 10 May 2025No. L-1/260/2021/CERC dated 10th May, 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short CERC draft amendment that would replace a single provision — clause (8) of Regulation 8 — of the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024, referred to throughout as the Principal Regulations. It is numbered L-1/260/2021/CERC, dated 10 May 2025, and is made under Section 178 of the Electricity Act, 2003; the change takes effect from 1 July 2025 (p1).

Section 1 is headed Short Title and Comments: it names the amending regulations, fixes the commencement date, and — together with the 'DRAFT AMENDMENT' heading — signals that the text is out for comment rather than final (p1).

Section 2 reproduces the full text of the substituted Regulation 8(8) on charges for injection of infirm power (p1–2). It sets a zero-charge default with two carve-outs, then overrides both with a frequency condition. The first carve-out covers thermal generating stations, paid at the Normal Rate of Charges for Deviation for each time block from first synchronisation of the unit until successful completion of the trial run, subject to a ceiling of ₹2.86/kWh. The second treats infirm power scheduled after a successful trial run as deviation of a general seller or WS seller, charged accordingly. The overriding clause makes charges zero when system frequency exceeds the stated threshold, notwithstanding the two carve-outs.

The closing Note records where the Principal Regulations, 2024 and the First Amendment Regulations, 2024 were published in the Gazette (p2). There are no schedules, forms, tables or annexures.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document