Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters (Third Amendment) Regulations, 2026

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (Third Amendment) Regulations, 2026

Amendment · Gazette copyDated 25 Aug 2026Published in the Gazette 7 Sep 2026In force from 31 Aug 2026F. No. L-1/260/2021/CERC dated 25th August, 2026

The Gazette copy of the Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Third Amendment, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

What it is. A Gazette notification of the Central Electricity Regulatory Commission (CERC) making the Third Amendment to its (Deviation Settlement Mechanism and Related Matters) Regulations, 2024 (p3). It is an amendment regulation, not a stand-alone framework: the operative text changes specific clauses of the 2024 Principal Regulations, whose publication and the two earlier amendments (2024 and 2025) are listed in a Note at the end (p4).

What it changes. Section 1 gives the short title and commencement — in force from 31.08.2026 (p3), ahead of the Gazette header date printed on page 1. Section 2 inserts a new clause (4A) into Regulation 8 so that deviation charges for “WS Sellers” are treated at par with General Sellers for projects bid or bid-submitted on or after 01.01.2027, and for other projects commissioned on or after 01.01.2029 (p3). Section 3 adds a Note after Regulation 8(5) requiring deviation charges for a standalone ESS that is a pumped hydro storage plant to be computed at the energy charge rate specified in the CERC Tariff Regulations, 2024 (p3). Section 4 widens the cross-references in Regulation 8(1) and 8(4) to pick up a new clause (2A), and inserts that clause so that infirm power injected by a standalone ESS between first synchronisation and successful trial-run completion is paid at the normal deviation charge per time block, subject to a ceiling (pp3–4). Section 5 amends Regulation 10(1) and 10(3) to let the 10-day payment deadline and the Letter-of-Credit encashment timeline instead follow the Detailed Procedure for the National Deviation and Ancillary Services Pool Account as approved by the Commission (p4).

Who should look at it. Analysts tracking deviation charges, energy-storage and pumped-hydro grid integration, infirm-power payments and DSM pool-account payment discipline; the operative detail is in ss.2–5 (pp3–4), with the commencement clause at p3.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy storage deployment, Payment security

Read with this

Other copies of these documents (3)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗