Skip to content

CERC · Central Electricity Regulatory Commission

DSM Regulations, 2024 — Commencement Notification, 16.09.2024

Notification - effective date 16.09.2024 (except Regulation 8(8))

Commencement noticeDated 16 Sep 2024No. L-1/260/2021/CERC 15 dated th September, 2024

Commencement notice for the Deviation Settlement Mechanism and Related Matters Regulations, 2024 or one of its amendments. The dates are in the notice.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page CERC notification that fixes, and staggers, the commencement of the CERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2024. Those Regulations were gazetted on 21.08.2024 (Gazette No. 642), and their Regulation 1(2) left the commencement date to be notified separately; that separate commencement notification was gazetted on 10.09.2024 (Gazette No. 712) (p1).

The present notification is a partial modification of that 10.09.2024 commencement notification. Everything in the DSM Regulations, 2024 except Clause 8 of Regulation 8 takes effect from 00.00 hours of 16.09.2024. Clause 8 of Regulation 8 is held back and, unless notified otherwise, takes effect from 00.00 hours of 01.11.2024 (p1).

To bridge the deferral, para 27(3)(a) of the Commission's order dated 06.02.2023 in Petition No. 01/SM/2023 continues in operation until 24.00 hours of 31.10.2024 (p1). The notification is signed by the Chief (Regulatory Affairs). It names no parties and sets no substantive DSM parameters; its whole content is timing.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document