Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement and Related Matters Regulations, 2024 — Statement of Reasons

Central Electricity Regulatory Commission (Deviation Settlement and Related Matters) Regulations, 2024 – Statement of Objects & Reasons (SOR) thereof.

Statement of reasonsDated 15 Nov 2024No. L-1/260/2021/CERC dated 15th November, 2024

The commission's reasons for the Deviation Settlement Mechanism and Related Matters Regulations, 2024 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 31 of 86. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons for the final CERC (Deviation Settlement and Related Matters) Regulations, 2024, issued on 15 November 2024 (p1). It records the consultation on the Draft DSM Regulations issued on 30 April 2024: comments were sought by 24 May 2024, extended to 3 June 2024, and a public hearing was held on 19 June 2024; 89 initial and 97 later stakeholder submissions are referred to and listed in Annexures I–II (p1–2).

The pages are a clause-by-clause account of stakeholder comments and the Commission's analysis. Chapter 2 covers definitions, explaining why terms such as Available Capacity, Contract Rate, Deviation, General Seller, Integrated Day Ahead Market, Regional Entity, Renewable Rich State, Renewable Super Rich State, Reference Charge Rate, Run-of-River Generating Station and WS Seller were retained, clarified or modified (p2–16). Chapter 3 addresses scope over grid-connected regional entities and other entities engaged in inter-State purchase and sale, and rejects deferral for SAMAST or change-in-law relief for existing RE projects (p16–17). Chapter 4 requires adherence to schedule and management of deviation through ancillary services, referring transmission-constraint and ramping issues to the Grid Code (p17–18). Chapter 5 sets deviation computation formulae and a transition: the available-capacity denominator continues to 31.03.2026, after which a weighted denominator applies from 01.04.2026, with X to be fixed by separate order (p19–22). Chapter 6 explains the Normal Rate, adopting the highest of DAM/RTM area clearing price and a composite including ancillary service charge, and directs NLDC to publish DSM charges and the computation methodology (p23–27). Chapter 7 begins the seller deviation charge table and stakeholder views on symmetry, volume limits and frequency bands (p27–31).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Ancillary services and reserves

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document