Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters (Third Amendment) Regulations, 2026 — Draft

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (Third Amendment) Regulations, 2026

Draft amendmentDated 26 May 2026No. L-1/260/2021/CERC dated 26.05.2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC draft third amendment to the Deviation Settlement Mechanism and Related Matters Regulations, 2024, made under s.178 of the Electricity Act, 2003, filed as No. L-1/260/2021/CERC and dated 26.05.2026, with commencement fixed at 01.07.2026 (p1). Six clauses do five substantive things.

First, it rewrites two definitions in Regulation 3 — sub-clauses (j)(iii) and (y)(iii) — so that the Area Clearing Price reference used in the deviation price formula becomes the daily weighted average across the Integrated-Day Ahead Market segments of all Power Exchanges for the day, instead of a weighted average for the respective time block (p1–2).

Second, it inserts clause (4A) into Regulation 8, placing a WS Seller's deviation charges at par with General Sellers, but only for projects bid out with tendering or bid submission dates on or after 01.01.2027 and, for other projects, those reaching commercial operation on or after 01.01.2029 (p2).

Third, a Note after Regulation 8(5) directs that deviation charges for a standalone ESS that is a pumped hydro storage plant be computed at the energy charge rate specified in the Tariff Regulations, 2024, as amended (p2).

Fourth, the infirm-power regime in Regulation 8 is widened: the zero-charge rule in 8(1) and the notwithstanding wording in 8(4) are conformed to recognise a new clause (2A), which pays standalone ESS infirm power at the normal rate of deviation charges, subject to a ceiling, from first synchronisation until the trial run is completed (p2–3).

Fifth, Regulation 10's payment deadlines are no longer fixed in the regulations: the earlier ten-day periods are replaced by the timeline stipulated in the Detailed Procedure for the National Deviation and Ancillary Services Pool Account (p3). A closing Note records where the Principal Regulations and the First and Second Amendments were gazetted (p4).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy storage deployment, Energy accounting and settlement

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document