Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Third Amendment, 2026

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (Third Amendment) Regulations, 2026

AmendmentDated 25 Aug 2026Published in the Gazette 21 Aug 2024In force from 31 Aug 2026No. L-1/260/2021/CERC dated 25.08.2026

Amends the Deviation Settlement Mechanism and Related Matters Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission's Third Amendment to its Deviation Settlement Mechanism (DSM) Regulations, 2024 was issued on 25 August 2026 and takes effect from 31 August 2026 (p1). It is a short, four-paragraph amending instrument that changes how deviation charges and infirm power payments are worked out for certain sellers and for standalone energy storage, and that softens the payment timeline in the deviation pool account.

Paragraph 2 inserts a new clause (4A) after clause (4) of Regulation 8 of the Principal Regulations: deviation charges for a "WS Seller" are to be treated at par with General Sellers, but only for projects under the bidding route with tendering or bid submission dates on or after 01.01.2027, and for other projects with commercial operation on or after 01.01.2029 (p1–2).

Paragraph 3 adds a Note after clause (5) of Regulation 8: deviation charges for a standalone ESS that is a pumped hydro storage plant under Section 62 of the Act are to be computed at the energy charge rate specified in Clause 3 of Regulation 66 of the CERC (Terms and Conditions of Tariff) Regulations, 2024, as amended from time to time (p2).

Paragraph 4 reworks clause (8) of Regulation 8. Sub-clauses 8(1) and 8(4) are amended only to add cross-references to a new 8(2A), which pays standalone ESS infirm power injected from first synchronisation to successful completion of the trial run at the Normal Rate of Charges for Deviations for each time block, subject to a ceiling (p2).

Paragraph 5 amends Regulation 10(1) and 10(3) so that payment may also be made within the timeline stipulated in the Commission-approved Detailed Procedure for the National Deviation and Ancillary Services Pool Account, alongside the existing ten-day limit that triggers late payment surcharge and Letter of Credit encashment (p3). A closing Note records the Gazette publication details of the Principal Regulations and the First and Second Amendments (p3–4).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy storage deployment, Energy accounting and settlement

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document