Deviation Settlement Mechanism (First Amendment) Regulations, 2024 — Explanatory Memorandum — Draft

Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (Frist Amendment) Regulations, 2024

Explanatory memorandum to a draftDated 2 Oct 2024

Explanatory memorandum to the Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC explanatory memorandum dated 02.10.2024 that accompanies and reasons out a first set of amendments to the Deviation Settlement Mechanism (DSM) Regulations, and invites stakeholder comments by 1 November 2024 (p1, p5). Its stated purpose is to give clarity on the treatment of deviation for infirm power and on other provisions — Available Capacity, and contract rate and reference rate for third-party sale under open access — while aligning the regulations with the Indian Electricity Grid Code and its amendments (p2).

The Background section (p2) sets out the implementation timeline of the principal regulations and the special position of Regulation 8(8), which was deferred so that an earlier Commission order on infirm power continues to operate until 31 October 2024. It records that representations from the RE association prompted the amendments.

Section 2 (p2–3) explains the Commission's reasoning on Available Capacity for a WS seller: where inverter or turbine capacity exceeds the connectivity granted, using the unrestricted figure in deviation computation would mislead and unduly benefit the seller, so the Capability figure is to be capped by connectivity, and it sets out the exact words proposed to be inserted into Regulation 3(1)(g).

Section 3 (p3–4) addresses an inadvertent omission: cases of sale of power through third parties or open access were left out of the definitions of contract rate and reference rate, and proposed insertions are given for Regulation 3(1)(j) and Regulation 3(1)(y).

Section 4 (p4–5) reproduces Regulation 8(8), the clarifications sought by RE developers, and the Commission's grid-security rationale against unbridled pre-commissioning injection, then sets out a strengthened provision with an added proviso tied to system frequency.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document