Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters Regulations, 2024 — Draft

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024

Draft regulationDated 30 Apr 2024L-1/260/2021/CERC dated 30th April, 2024

Draft

A proposal that has since been finalised as the Deviation Settlement Mechanism and Related Matters Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's draft replacement for the deviation settlement regime. Issued as notification No. L-1/260/2021/CERC dated 30 April 2024 (p1), it publishes for previous publication the CERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2024, made under s.178 read with s.79(1)(c) and (h) of the Electricity Act, 2003 (p1). The stated objective is a commercial mechanism that keeps grid users to their schedules in the interest of grid security and stability (p1). Commencement is left to a separate notification by the Commission (p1), and from that commencement the 2022 DSM Regulations stand repealed, with a savings clause preserving things done under them (p15).

Regulations 3 and 4 fix the vocabulary and reach: definitions create the seller categories (general seller, WS seller, run-of-river hydro, municipal-solid-waste stations), the buyer categories tied to RE-rich and RE Super-rich States, energy storage systems and the Deviation and Ancillary Service Pool Account (p2–4); scope covers all grid-connected regional entities and others engaged in inter-State purchase and sale (p4). Regulation 5 requires adherence to schedule and says deviation is generally to be managed through ancillary services deployment (p4).

Regulation 6 sets the formulas for computing deviation for general sellers, WS sellers (measured against available capacity) and buyers (p5). Regulation 7 builds the Normal Rate from weighted-average Day Ahead Market, Real-Time Market and ancillary service charge components, with fallbacks when ancillary services are not despatched or ACP is unavailable (p5–6). Regulation 8 is the operative core: a frequency-linked charge matrix for general sellers, frequency-independent treatment for RoR hydro, municipal-solid-waste stations and WS sellers, treatment of standalone and WS-co-located storage, buyer charge bands and volume limits by buyer class, and special cases — infirm power, start-up and shutdown power, inter-regional and cross-border deviation, forced outage, multiple contracts, HP-DAM sales and States with net injection at the regional periphery (p6–13).

Regulation 9 sets the weekly accounting cycle from RLDC data to RPC statements, the credits and debits of the Deviation and Ancillary Service Pool Account, and how a regional deficit is met from other regions' surpluses and then from drawee DICs, on a ratio that changes from 01.04.2025 (p13–14). Regulation 10 makes deviation payment a high-priority obligation, with a late payment surcharge, a Letter of Credit requirement for past defaulters and encashment on failure (p14–15). Regulations 11 to 13 give the Commission power to relax provisions, to issue practice directions to remove difficulty, and to repeal and save (p15).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Ancillary services and reserves

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document