Deviation Settlement and Related Matters (First Amendment) Regulations, 2024 — Statement of Reasons

Central Electricity Regulatory Commission (Deviation Settlement and Related Matters) (First Amendment) Regulations, 2024 – Statement of Objects & Reasons (SOR) thereof.

Statement of reasonsDated 17 Dec 2024No. L-1/260/2021/CERC dated 17.12.2024

The commission's reasons for the Deviation Settlement Mechanism and Related Matters Regulations, 2024 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission issued this Statement of Reasons on 17 December 2024 to explain and record its decisions on the objections and suggestions received on the draft CERC (Deviation Settlement and Related Matters) (First Amendment) Regulations, 2024. It follows the principal DSM Regulations 2024 notified on 5 August 2024 and effective 16 September 2024 (p1). After written comments were invited by 1 November 2024 and a public hearing held by video conferencing on 4 November 2024, the Commission finalised the amendment (p2).

The SoR takes each proposed change in turn. On Regulation 3(1)(g) it confirms that Available Capacity will be limited to the quantum of connectivity granted, rejecting arguments for a buffer or higher installed capacity; it explains that scheduling is permitted only up to GNA and that the change affects only % deviation computation, not operating practice (p2–4). On Regulations 3(1)(j) and 3(1)(y), it retains amendments bringing third-party open access sales by WS/MSW sellers and general sellers within the Contract Rate and Reference Charge Rate definitions, treating the original omission as inadvertent and declining to use PPA transfer prices or National APPC (p4–5).

On Regulation 8, it retains the proposed rule that charges for injection of infirm power are zero, with scheduled infirm power after trial run charged as for a general or WS seller, and zero deviation charges for over-injection above 50.05 Hz during high frequency; it explains that scheduling before successful trial run is not to be permitted and directs staff to process Grid Code changes for scheduling after trial run (p5–9).

The final section records decisions on other suggestions: PSP reference charge rate will follow CERC Tariff Regulations 2024, the amendment takes effect from 23 December 2024 and is not retrospective, and other suggestions are beyond scope (p9–11). Annexures I and II list the 24 stakeholders who commented and those who presented at the hearing (p12).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Connectivity and GNA, Scheduling and despatch

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document