Draft Deviation Settlement Mechanism (Second Amendment) Regulations, 2025 — Explanatory Memorandum

Explanatory Memorandum

Explanatory memorandum to a draftDated 10 May 2025No. L-1/260/2021/CERC dated 10th May 2025

Explanatory memorandum to the Deviation Settlement Mechanism and Related Matters (Second Amendment) Regulations, 2025 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is CERC's explanatory memorandum for a draft second amendment to the Deviation Settlement Mechanism (DSM) Regulations, 2024, issued on 10 May 2025 (p1). It explains why the Commission proposes to amend Regulation 8(8) and reproduces the proposed amended text.

Part 1 (Background, pp1–3) recounts the DSM Regulations 2024, notified on 5 August 2024 and in force from 16 September 2024 except Regulation 8(8), which took effect on 23 December 2024; and the First Amendment notified in December 2024, effective from 23 December 2024, which made charges for injection of infirm power zero but allowed deviation charges for scheduled infirm power after a successful trial run. It records representations from thermal generating companies about fuel-cost recovery up to trial run, and a Ministry of Power letter dated 27 March 2025 asking CERC to review infirm-power provisions for thermal generators (p2). CERC examines data on the quantum and duration of infirm injections, notes that thermal plants incur fuel costs during testing, and contrasts the 2014 framework (payment permissible subject to a ceiling but no scheduling before commissioning) with the 2024 framework (scheduling after successful trial run) (pp2–3).

Part 2 (Proposed Amendments, pp3–4) sets out the change: allow limited commercial payment for infirm power injected by thermal generating stations between first synchronization of the unit and successful completion of the trial run, at the Normal Rate of Charges for Deviation subject to a ceiling. The ceiling is computed at ₹2.86/kWh from the mean energy charges of regulated thermal generating stations for FY 2023-24 (p3). The draft amended Regulation 8(8) has four clauses: zero charges generally; thermal infirm power paid at normal deviation charges subject to the ceiling; scheduled infirm power after successful trial run subject to general seller or WS seller deviation charges; and zero payment when system frequency f > 50.05 Hz (pp3–4).

The memorandum seeks stakeholder comments by 10 June 2025 (p4). It is a consultation document, not the final amendment.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (4)

Earlier drafts

9 more documents belong here and are not on Voltaic: 6 drafts or notices on a draft not held as English text, 2 drafts or notices on a draft and 1 procedure or order made under it.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document