Promotion of Generation from Renewable Energy Sources and Tariff Determination (Fourth Amendment) Regulations, 2020 — Draft

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Fourth Amendment) Regulations, 2020

Published with a draftDated 23 Mar 2020No. HPERC/428. dated 23rd March, 2020

Published with the Renewable Energy Tariff Fourth Amendment Regulations, 2020 — Modifications to draft — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification by the Himachal Pradesh Electricity Regulatory Commission publishing proposed Fourth Amendment Regulations to its 2017 RE tariff regulations for objections and suggestions (p1–2). The recitals say the existing control period and the Central Commission's RE regulations end on 31 March 2020, and that the Commission first proposed extending the control period to 30 September 2020 but curtailed it to 31 March 2020 on stakeholder request to align with CERC; it now proposes a third control period from 1 April 2020 (p1).

The draft regulations would come into force on 1 April 2020, but objections are invited for 60 days from publication in the Rajpatra (p1–2). Clause 2 amends regulation 9 to provide that the small hydro third control period runs from 1 April 2020 to 31 March 2025 (p2). Clause 3 inserts a Part III on financial principles into Chapter IV, specifying capital-cost scope and exclusions, treatment of subsidy, incentive and generation-based incentive, debt-equity, loan and finance charges, depreciation, return on equity, working capital for different technology groups, O&M expenses, taxes and duties, rebates, late payment surcharge, ceiling norms and application to all RE technologies (p2–8).

Clause 4 inserts a Part III on small hydro technology parameters into Chapter V: capacity categories, normative capital cost, CUF-based saleable energy, free-power structure and adjustment formula, auxiliary/transformation losses, project-line losses, O&M norms and capacity rounding (p8–11). Clause 5 makes consequential reference substitutions in the 2017 Regulations (p12). This is a draft; no repeal, savings or final notification is stated.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Tariff determination, Renewable energy tariff, Multi Year Tariff (MYT)

Read with this

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document