Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
Showing the best matches for “energy storage obligation”: 22 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
Procurement of Energy from Renewable Sources Regulations, 2011 — Ninth Amendment, 2022
Amends the Procurement of Energy from Renewable Sources Regulations, 2011
Framework for Resource Adequacy Regulations, 2024
- 9. Methodology of preparation of Resource Adequacy Plan… l) Renewable Purchase Obligation (RPO), Energy Storage Obligation targets, etc. 9.2. The projected hourly or sub-hourly or time interval as may be notified by the Commission from time to time demand for the future years shall be used as …
- 9. Methodology of preparation of Resource Adequacy Plan… Fulfilment of Renewable purchase obligation should be considered as one of the objectives of Resource Adequacy. Technology options like renewable generation for round the clock energy supply backed with storage (Battery and PSP), …
2 matching passages in this document
Ancillary Services Regulations, 2025
Multi Year Transmission, Distribution and Retail Supply Tariff Regulations, 2024
1 amendment on Voltaic
Ancillary Services Regulations, 2025
- FRAMEWORK AND OPERATIONAL GUIDELINES FOR ANCILLARY SERVICES › 7. Eligibility for an SRAS Provider… Eligibility for an SRAS Provider A generating station or an entity having energy storage resources or an entity capable of providing demand response, on a standalone or aggregated basis, connected to the intra-State transmission system, …
- DEFINITIONS › 3. Definitions(11) "Energy Storage" in relation to the electricity system, means a facility where electrical energy is converted into any other form of energy which can be stored, and subsequently reconverted into electrical energy;
2 matching passages in this document
Grid Interactive Distributed Solar Photovoltaic (DSPV) Plants Regulations, 2026
- 2. Definitions… as the case may be and connected to the grid network with or without energy storage having an anti-islanding protection to prevent flow of energy into the grid when grid supply is not available. …
- 2. Definitions… The stored energy can be utilized for their own use. Provided that, the Commission shall review the requirement of distributed energy storage at prosumer level after two years from the date of notification of these Regulations or at the …
2 matching passages in this document
Forecasting, Scheduling and Deviation Settlement Mechanism for Sellers of Wind, Solar and WS-Hybrid Generation Sources Regulations, 2026
Karnataka Electricity Grid Code (KEGC), 2025
Karnataka Electricity Grid Code, 2025
Generation Tariff Regulations, 2024
Generation Tariff Regulations, 2014
Replaced byGeneration Tariff Regulations, 2019Generation Tariff Regulations, 2019
Replaced byGeneration Tariff Regulations, 2024Generation Tariff Regulations, 2024
Conditions of Supply of Electricity of Distribution Licensees in Karnataka, 2006 — Eighth Amendment, 2019
Framework for Demand Flexibility (DF)/Demand Side Management (DSM) Regulations, 2026
Terms and Conditions for Open Access Regulations, 2025
Terms and Conditions of Tariff Regulations — Approach Paper for Control Period 1.4.2014 to 31.3.2019
Replaced byGeneration Tariff Regulations, 2019Eligibility Conditions and Duties of Electricity Trader Regulations, 2004
Open Access Regulations, 2025 — Statement of Reasons
Merit Order Despatch and Optimization of Power Purchase Cost Regulations, 2024
Karnataka Electricity Distribution Code (KEDC), 2025
Merit Order Despatch and Optimization of Power Purchase Cost Regulations, 2024