Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code (Removal of Difficulties) Orders, 2014 — First to Fourth

Kerala Electricity Supply Code (Removat of Difnculties) Order' 2014

OrderDated 23 Sep 2014g34CEXXSERC/14 dated 23rd September 2014

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a bundle of four 'Removal of Difficulties' orders issued by KSERC on 23 September 2014, each using the Code's difficulty-removal power (regulation 179) to alter one specific provision of the Kerala Electricity Supply Code, 2014, which had come into force on 1 April 2014 (p1, p3, p4).

The First Order (pp1–2) suspends regulation 43 'for the time being' and substitutes a new regulation 43 on supply of electricity where an existing building is demolished and reconstructed. It sets out how the existing service connection may be continued or shifted to a weatherproof kiosk during reconstruction, the tariff basis during construction, and what happens when the new building's load does or does not justify shifting the connection.

The Second Order (p3) replaces item (ii) of sub-regulation (4) of regulation 15 — the Electrical Inspector approval trigger — with the term 'High rise building', on the ground that 'multi-storied building' was ambiguous and drew stakeholder complaints.

The Third Order (pp3–4) inserts a proviso to sub-regulation (2) of regulation 11 for consumers who existed when the 2005 Code took effect and were permitted low-tension supply up to a connected load or contract demand of 150 kVA, letting them stay at the same voltage level subject to payment of low voltage surcharge.

The Fourth Order (pp4–5) corrects Schedule 2 ('Model Estimated Rates for Distribution Work') so the supervision charge is 10% of items I(c) and I(d) only.

All four come into force on Gazette publication; the Gazette date is not printed.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Supply to buildings and colonies

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document