Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015

OrderDated 2 Jun 2015No.215/DD/T&D/14/KSERC dated 2 nd June 2015

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page KSERC removal-of-difficulties order that relaxes the waiting period for HT consumers seeking their first reduction of contract demand (p1). The preamble records that the Kerala Electricity Supply Code, 2014 came into force on 1 April 2014; that regulation 100(1) requires six months from original energization for LT connections and one year for HT or EHT connections before a reduction application; and that regulation 100(2) allows a reduction only once every six months thereafter (p1). It notes HT consumers' complaint that the one-year initial wait forces industrial and commercial units to pay high demand charges during low-consumption start-up months (p1). Exercising regulation 179 powers, the Commission orders in public interest that an HT consumer's first reduction application be accepted after six months from original energization (p1). Clause 1 names the order and brings it into force on its date; clause 2 states the relaxation (p1). It does not change regulation 100(2).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document