Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015

OrderDated 23 Jun 2015No.781/Com.Ex/KSERC/2015 dated 23rd June, 2015

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Kerala State Electricity Regulatory Commission issued this order on 23 June 2015 to work around a gap left when the Kerala Electricity Supply Code, 2014 replaced the 2005 Code (p1). The 2005 Code let an applicant for a connection who did not need the licensee to build the line or plant do the work himself through a licensed contractor, paying a share of expenses as supervision charges; the 2014 Code dropped that route (p1–2). Applicants who had already bought costly cables, meters, RMUs and transformers in anticipation, and who faced procedural delays in getting supply, asked to be allowed to execute the works themselves (p2).

The order, made under regulation 179 of the 2014 Code, partially relaxes regulations 36 and 37 for that purpose (p2). Clause 1 gives the short title and brings it into force on the date of the order (p2). Clause 2 lets a licensee permit an applicant to provide the electric line or plant himself, but only where the licensee is satisfied it cannot meet the regulation 85 timelines, and only on conditions: BIS-conforming materials, conformity with standards published on the licensee's website, prior intimation of the procurement source, warranty where stipulated, execution by a licensed contractor under CEA and Chief Electrical Inspector standards, licensee supervision for a fee capped at ten percent of labour and transport cost, and Electrical Inspector approval before energising (p3). The facility is expressly temporary, available only till 31st December, 2015 (p3).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges, Conditions of supply

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document