Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025

Kerala Electricity Supply Code (Removal of Difficulties) Order 2025

OrderDated 6 Jan 2025No. 3401/Com.Ex./2023/KSERC dated 6 th January, 2025

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

KSERC's Removal of Difficulties Order, 2025 (No. 3401/Com.Ex./2023/KSERC, dated 6 January 2025) is a short, self-contained instrument that eases the route to electricity connection for individual buyers in stalled residential colonies and villa projects (p1).

The first four pages are recitals. They restate the regime being relaxed: Regulation 36(iii) of the Kerala Electricity Supply Code, 2014 makes the applicant — including a developer or builder of a colony with demand above one megawatt — bear the cost of extending or upgrading the distribution system undertaken exclusively for its connection (p1); Regulation 49, as amended in 2020 and by the Fifth Amendment Code 2024, splits the cost of modification/upgradation and internal-network construction between licensee and developer depending on whether the project's total load is above or at/below one megawatt (p1–2). Section 43(1) of the Electricity Act, 2003 requires supply within a month of application (p2–3). The Commission then records the difficulty: promoters abandon projects midway or miss RERA timelines, disputes pend before the Kerala Real Estate Regulatory Authority, and RERA cannot direct licensees under the Electricity Act; licensees therefore cannot recover capital expenditure or get the internal network built, leaving beneficiaries without supply (p3–4).

The operative part is two clauses (p4–6). Clause 1 gives the short title and brings the order into force from the date of the order. Clause 2, overriding Regulations 36 and 49, lets individual beneficiaries in such projects apply separately for service connections and requires the licensee to verify the application and estimate expenditure — separately for projects above one megawatt (extension/upgradation plus internal network) and those at or below it (internal network only), apportioned to each applicant by connected load. Beneficiaries pay their proportionate share; the balance is recovered from other beneficiaries as and when they apply. Clause 2 also lets the licensee carry the capital cost in GFA/NFA within its ARR & ERC and net it off as consumer contributions come in, and places maintenance of the internal distribution network on the licensee with cost recovery through ARR & ERC under the tariff regulations (p5–6).

Standard name
Electricity Supply Code
Primary topics
Supply to buildings and colonies, New connections and load changes, Connection and miscellaneous charges

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document