Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016

OrderDated 26 Oct 2016No. 1504/DD (T)/Supply Code/2016/KSERC dated 26th October 2016

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a four-page KSERC notification issued on 26 October 2016 that eases parts of the Kerala Electricity Supply Code, 2014 to make it quicker to obtain a new electricity connection (p1, p3). The preamble records that the State Government, using its Section 108 direction power, told the Commission to rework the Code — simplified application forms, online filing and payment, fewer documents, per-kVA/kW charges instead of site-specific estimates, connection without ownership proof for small houses, self-certification in place of contractor and Electrical Inspectorate certificates, and advance registration for loads above about 100 kVA — and that the Ministry of Power wanted a three-step, 15-day process (p1–3).

The operative part is much narrower than those recitals. Using Regulation 179 of the Code, the Commission relaxes Regulation 75 "notwithstanding" its sub-regulations. Clause 1 gives the title and makes the order effective from gazette publication (the gazette date is not printed). Clause 2(1) substitutes new application formats for new LT connections based on connected load and for new EHT/HT/LT demand-based connections, in place of formats approved by the Commission's letter of 08-04-2016 — Annexures I and II. Clause 2(2) adopts formats for transfer of service connection, change of name (including to legal heirs), conversion/shifting, tariff change and load/contract-demand changes, Annexures III to VII. Clause 2(3) requires online application, upfront payment and progress tracking. Clause 2(4) limits documents for new connections to proof of identity and proof of ownership/legal occupancy, and waives the ownership proof for residential structures of 100 sq metres or less, with the caveat that a connection does not prove legality of the structure (p3–4).

All formats are stated to be in respect of K S E B Ltd.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document