Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015

OrderDated 3 Jun 2015Published in the Gazette 9 Jun 2015No. 781/Com.l rx./KSl,l{(l/2015

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015 is a short KSERC order that temporarily lets an applicant for a new electricity connection build the electric line or plant himself instead of waiting for the distribution licensee to do it (pp1, 4). It is made under regulation 179 of the Kerala Electricity Supply Code, 2014 and presents itself as a partial relaxation of regulations 36 and 37 of that Code (p4).

The recitals (pp2–3) explain the difficulty: the 2005 Supply Code's regulation 8(9) had allowed an applicant who chose to provide the line or plant himself to pay ten per cent supervision charges and have the work executed by a licensed contractor under the licensee's technical supervision, but the 2014 Code dropped that provision. The Commission records that several persons had already bought costly conductors, cables, meters, transformers and other equipment in anticipation of supply, and that applicants complained of procedural delays by the licensee; KSEB Ltd asked the Commission to allow willing applicants to execute service-line works themselves under its supervision on payment of supervision charges of ten per cent of labour and transport charges (p3).

The operative part (pp4–5) provides that where an applicant applies to do the work himself, the licensee may grant permission if it is satisfied it cannot release the connection within the time limit in regulation 85 of the 2014 Code. Permission is conditional on BIS-standard materials, conformity with the licensee's published material standards, prior information on the source of materials, warranty documents, execution by a duly licensed electrical contractor to Central Electricity Authority and Chief Electrical Inspector standards, work under the licensee's supervision for a supervision fee capped at ten per cent of labour and transport cost, and Electrical Inspector approval before energising (pp4–5).

The order takes effect on the date of the order, 3 June 2015, and the facility is available only until 31 December 2015 (pp1, 4–5).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges, Electrical safety

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document