KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016

OrderDated 26 Oct 2016Published in the Gazette 16 Nov 2016No. 1504/DD(T)/Supply Code/2016/KSERC. dated 26th October, 2016

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Kerala State Electricity Regulatory Commission issued this order on 26 October 2016 (p1) and it took effect on its gazette publication of 16 November 2016 (p1–2). It responds to directions the Kerala Government gave the Commission under Section 108 of the Electricity Act 2003 to simplify the application formats and procedures of the Kerala Electricity Supply Code, 2014 so that connections are released faster — including a Ministry of Power instruction for a short, time-bound procedure for commercial and industrial applicants, and the State's commitment to power all households by March 2017 (p1–2).

Using its difficulty-removal power in Regulation 179, the Commission relaxes Regulation 75 of the Code in public interest (p2). For KSEB Ltd, new low-tension connections (connected-load billing) and new EHT/HT/LT demand-based connections must be applied for on the revised formats at Annexure I and Annexure II, replacing the formats approved by the Commission's letter of 8 April 2016 (p3). Formats for transfer of service connection, change of name by sale/lease/change of ownership or occupancy, change of name for legal heirs, conversion/shifting/tariff change, and enhancement or reduction of load/contract demand are given as Annexures III to VII (p3, pp11–20). The licensee must offer online filing, upfront payment and progress tracking (p3). Documents for a new connection are cut to two — proof of identity and proof of ownership/legal occupancy — in normal cases, and residential structures of plinth area 100 sq. metres and less may be connected without local-body proof of ownership, on the condition that a connection is not proof of legality, ownership or possession (p3).

Several directions recited in the preamble — per-kVA/kW charges where mains are within about 200 metres, self-certification in place of test-cum-completion reports and Electrical Inspectorate approval, and advance registration above roughly 100 kVA — do not all reappear as operative relaxations (p1–3).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document