Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code — Sixth Removal of Difficulties Order, 2015

Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015

OrderDated 23 Jun 2015No.781/Com.Ex/KSERC/2015 dated 23rd June, 2015

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015 is a short KSERC notification (No.781/Com.Ex/KSERC/2015, dated 23 June 2015) that reopens, for a limited window, an option that disappeared when the 2005 Supply Code was repealed: letting an applicant for a new connection build its own electric line or plant. The recitals (p1–2) record that reg 8(9) of the 2005 Code allowed an applicant who did not need the licensee to provide line or plant to get the work executed through a licensed contractor on payment of supervision charges; the 2014 Code has no equivalent, and applicants who had already bought cables, meters, RMUs and transformers in anticipation, along with KSEB Limited itself (letter dated 17.12.2014), asked for the facility to be revived because procurement and award delays made the reg 85 connection timelines hard to meet.

Exercising its removal-of-difficulties power under reg 179, the Commission makes the order in partial relaxation of regulations 36 and 37 of the 2014 Code (p2). Clause 1 names the order and brings it into force on the date of the order itself, i.e. 23 June 2015 (p2).

Clause 2 (p2–3) is the operative part: where an applicant in the reg 36 classes applies for permission to provide the line or plant himself to speed up supply, the licensee may grant it if satisfied it could not otherwise meet the reg 85 timelines, subject to conditions — BIS-conforming materials, conformity with standards published on the licensee's website, prior intimation of procurement source, submission of any stipulated warranty, execution by a licensed electrical contractor to CEA and Chief Electrical Inspector standards, work under licensee supervision for a supervised fee capped at ten percent of labour and transport cost, and Electrical Inspector approval before energising. Clause 2(2) limits the facility to 31 December 2015.

Signed by the Chairman, two Members and the Secretary (p3).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply, Connection and miscellaneous charges

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document