KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024

OrderDated 20 Nov 2024Published in the Gazette 25 Nov 2024No. 1234/Con.Engg./2023/KSERC dated 20th November, 2024

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Kerala State Electricity Regulatory Commission issued this removal-of-difficulties order on 20 November 2024 (No. 1234/Con.Engg./2023/KSERC), published in the Kerala Gazette Extraordinary dated 25 November 2024 (p1). It is a short, three-clause instrument used to close gaps between the Kerala Electricity Supply Code, 2014 and the central consumer-rights rules.

The recitals (p1–2) record that the Code came into force on 1 April 2014 and was amended by the Kerala Electricity Supply (Fifth Amendment) Code, 2024, gazetted on 31 July 2024, which set per kVA/kW recovery rates for LT and 11 kV applicants and new connection timelines. KSEB Ltd's letter of 17 October 2024 reported that the Ministry of Power had sought clarity on the 200-metre limit in Regulation 32(2)(i), and had directed DISCOMs to specify metro-city service-connection timelines under the Electricity (Rights of Consumers) Amendment Rules, 2024. The Commission was satisfied a difficulty had arisen from the perceived divergence between the Central Rules and the Code.

The operative part (p2–3) names the order and brings it into force on the date of the order (p2); defines 'Electrified areas', for purposes of the Code, as an area having distribution mains at the respective voltage level "within 200 metres from the proposed connection" (p3); and relaxes clause (iii) of Regulation 85(1), notwithstanding that provision, so that in metropolitan areas the licensee must release a new connection within three days of an application complete in all respects where no extension or augmentation is required (p3). It binds the distribution licensee in favour of applicants for new connections.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document