KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025

Kerala Electricity Supply Code (Removal of Difficulties) Order 2025

OrderDated 6 Jan 2025Published in the Gazette 7 Jan 2025No. 3401/Com.Ex./2023/KSERC dated 6th January, 2025

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a KSERC order, notified as No. 3401/Com.Ex./2023/KSERC dated 6 January 2025 and published in the Kerala Gazette Extraordinary on 7 January 2025, issued under Regulation 179 of the Kerala Electricity Supply Code, 2014 to remove difficulties in working Regulations 36 and 49 of that Code (p1, p4).

The problem it addresses is set out in the recitals: promoters and developers of RERA-registered residential colonies and villa projects have abandoned projects midway, left them incomplete beyond RERA timelines, or are in dispute with beneficiaries before Kerala RERA or the Appellate Tribunal. Because Regulations 36 and 49 place the cost of extending/upgrading the distribution system and of building the internal distribution network on the developer, licensees cannot give individual beneficiaries connections, and Kerala RERA cannot direct licensees under the Electricity Act, 2003 (p2–4).

The operative order (pp4–6) relaxes Regulations 36 and 49 notwithstanding anything in them. Individual beneficiaries in such projects may apply separately for service connections. The licensee must verify the application and estimate expenditure, treating projects above one megawatt differently from those at or below one megawatt — in the former, external extension/upgradation plus internal network cost is shared; in the latter, only internal network cost. Each applicant remits a share proportionate to connected load; the balance is recovered from other beneficiaries as and when they apply. The licensee may carry the capital cost in GFA/NFA in its ARR & ERC and net it off as contributions are recovered, and thereafter maintains the internal network, claiming the cost in ARR & ERC under the tariff regulations.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges, Supply to buildings and colonies

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document