Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply (Amendment) Code, 2020

Amendment · Gazette copyDated 22 Jan 2020No. 609/D(T)/2018/KSERC dated 22nd January 2020

The Gazette copy of the Kerala Electricity Supply (Amendment) Code, 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Kerala State Electricity Regulatory Commission's Notification No. 609/D(T)/2018/KSERC, dated 22 January 2020, makes 24 amendments to the Kerala Electricity Supply Code, 2014 — the rules a Kerala distribution licensee applies for supply voltage and load classification, builder-built networks, billing, inspection and assessment of unauthorised use (p1).

Regulation 11 is recast on supply voltage and load thresholds: billing on contract demand is carved out, and grandfathering provisos let low-tension consumers who already exceeded the Code's load limits — 100 kVA as on the 2005 Code, and 150 kVA for those admitted under the 2008 Fourth Amendment — stay at the same voltage and load, subject to a low-voltage surcharge, until they seek a revision. A further proviso caps LT contract demand for industrial consumers in Government-notified industrial parks/estates, with the LT metering point at the transformer (p1–2).

Regulation 49 is replaced on who builds, hands over and maintains the internal distribution network of colonies, complexes and high-rise buildings, and on how total connected load is estimated; Regulation 50 switches the load norm from constructed area to plinth area constructed (p2–3). Later clauses set interest on delayed adjustment of amounts, the window for shifting lines, cost data for line shifting, arrear/excess charge determination with installment relief, rename 'penalty' as 'interest', and designate who may enter and inspect premises (p3–4).

The closing block governs Section 126 assessment: inspection powers of officers of Sub-engineer rank and above, the payment option on a provisional assessment order, deletion of sub-regulation 155(12), extension of appeal-related windows from seven to thirty days, and refunds with interest at 'FBIL +200 base points' compounded half-yearly when the Appellate Authority finds no unauthorised use or the deposit exceeds the amount determined (p4–5).

It takes effect from Gazette publication; the Gazette date is not printed here (p1). It is a self-contained amendment with no schedules or tables.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Supply to buildings and colonies, Theft and unauthorised use

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (1)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document