Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
OrderDated 9 Apr 2025No. 1234/Con.Engg/ 2023/ KSERC dated th April, 2025
Made under the Kerala Electricity Supply Code, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A short KSERC order that uses the Commission's difficulty-removal power under Regulation 179 of the Kerala Electricity Supply Code, 2014 to relax the 50 hp single-motor ceiling that the Fifth Amendment Code, 2024 inserted as Regulation 8A(4) for 415 V three-phase consumers (p1–2).
The recitals set out why: stakeholders complained that the ceiling was denying LT three-phase connections even where consumers had installed dedicated distribution transformers, and pointed to soft starters, VFDs and capacitors as ways of limiting inrush current. The Chief Electrical Inspector, by letter of 2 March 2025, confirmed that such connections are electrically safe where the starting current stays within Regulation 16(3) and the motor load stays within 30% of transformer capacity, and the Commission accepted that view (p1–2).
Clause 1 gives the title and brings the order into force from its own date, 9 April 2025 (p2). Clause 2, notwithstanding Regulation 8A(4), permits low-voltage consumers to install single motors above 50 hp on two conditions — the starting-current limit in Regulation 16(3), and a motor load no greater than 30% of the supplying distribution transformer's capacity — and sub-clause (2) supplies the formula for the minimum transformer size (p2–3).
Read with this
The regulation
- Dated 31 Jan 2014Kerala Electricity Supply Code, 2014
Amendments and corrections
- Dated 8 May 2015Kerala Electricity Supply Code, 2014 — Amendment, 2015
- Dated 11 Jan 2016Kerala Electricity Supply Code, 2014 — Amendment Code, 2016
- Dated 24 Jan 2017Kerala Electricity Supply (Amendment) Code, 2017
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 23 Sep 2014Kerala Electricity Supply Code (Removal of Difficulties) Orders, 2014 — First to Fourth
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 3 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code — Sixth Removal of Difficulties Order, 2015
- Dated 11 Jul 2016Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015 — validity extension to 30.09.2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
Consolidated copies, for reference (1)
- Dated 14 Oct 2025Kerala Electricity Supply Code, 2014 (as amended)
Other copies of these documents (2)
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment Code, 2024
11 more documents belong here and are not on Voltaic: 11 copies in another language.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.