Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025

OrderDated 9 Apr 2025No. 1234/Con.Engg/ 2023/ KSERC dated th April, 2025

Made under the Kerala Electricity Supply Code, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A short KSERC order that uses the Commission's difficulty-removal power under Regulation 179 of the Kerala Electricity Supply Code, 2014 to relax the 50 hp single-motor ceiling that the Fifth Amendment Code, 2024 inserted as Regulation 8A(4) for 415 V three-phase consumers (p1–2).

The recitals set out why: stakeholders complained that the ceiling was denying LT three-phase connections even where consumers had installed dedicated distribution transformers, and pointed to soft starters, VFDs and capacitors as ways of limiting inrush current. The Chief Electrical Inspector, by letter of 2 March 2025, confirmed that such connections are electrically safe where the starting current stays within Regulation 16(3) and the motor load stays within 30% of transformer capacity, and the Commission accepted that view (p1–2).

Clause 1 gives the title and brings the order into force from its own date, 9 April 2025 (p2). Clause 2, notwithstanding Regulation 8A(4), permits low-voltage consumers to install single motors above 50 hp on two conditions — the starting-current limit in Regulation 16(3), and a motor load no greater than 30% of the supplying distribution transformer's capacity — and sub-clause (2) supplies the formula for the minimum transformer size (p2–3).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (2)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document