Skip to content

KSERC · Kerala State Electricity Regulatory Commission

Kerala Electricity Supply Code, 2014 — Fifth Amendment Code, 2024

Kerala Electricity Supply (Fifth Amendment) Code, 2024

Amendment · Gazette copyDated 26 Jul 2024Published in the Gazette 31 Jul 2024No. 1234/Con.Engg/2023/KSERC dated 26th July, 2024

The Gazette copy of the Kerala Electricity Supply Code, 2014 — Fifth Amendment, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on dev.erckerala.org ↗

Summary

Summary written by software, from pages 1 to 31 of 38. Check the regulator's original before you rely on it.

KSERC Notification No. 1234/Con.Engg/2023/KSERC dated 26 July 2024, printed in the Kerala Gazette Extraordinary of 31 July 2024, makes the Kerala Electricity Supply (Fifth Amendment) Code, 2024. It amends the Kerala Electricity Supply Code, 2014 under s.181(1) read with s.50 of the Electricity Act, 2003, and comes into force on Gazette publication (p1). It is a large, wide-ranging amendment: dozens of regulations are substituted, inserted or tweaked, plus one new Annexure.

Regulation 2 is rewritten wholesale, restating the Code's dictionary — what an agreement, applicant, connected load, contract demand, check meter, defective meter, demand factor, due date, occupier, temporary connection and the new grievance bodies (CGRF and IGRC) mean (pp2–5). New definitions include 'Nano household units', limited to 5 hp/4 kW connected to a domestic installation at domestic tariff (p5).

Voltage and load architecture is reset. Regulation 8's voltage-wise load table is substituted and its provisos dropped; a Note discourages future 22 kV networks; a new Regulation 8A sets special conditions for supply at different voltage levels, including permitted overshoot where higher-voltage lines do not exist, motor-size limits, dedicated-cable cases and 400 kV connectivity (pp6–7). Regulation 11 is replaced with new LT demand-based metering limits and a demand-factor method; Regulation 12 is replaced so that power quality impairing units must take a dedicated feeder at their own cost, with an exemption route through soft starters and harmonic filters (pp8–9).

Connection economics are re-cast around a per kVA/kW rate. Regulations 32 and 33 are amended so the licensee recovers expenditure on Commission-approved per kVA/kW rates for LT and 11 kV consumers, with annual rate proposals and energization charges for dwelling units; Regulations 36, 37 and 49 are conformed, and Regulation 46 is omitted altogether (pp10–12). A new Regulation 50A introduces power feasibility sanction for prospective consumers above 20 kW/kVA, with advance cost recovery, and Regulations 58 and 59 are amended to match (pp12–14). Regulations 70, 71 and 73 give landlords and tenants separate accounts for security deposits on rented premises (pp14–15).

The service-connection process is pushed online. Regulations 75 to 79 are substituted — default online application modes with Aadhaar/OTP authentication, auto-generated demands, two-document applications, inspection and re-inspection timelines — and Regulations 80, 81, 82, 83 and 85 are amended, including a new Regulation 85 timeline table with an Explanation for cases needing network extension (pp15–22). Later regulations move shifting, load enhancement and regularisation online, and a new Regulation 90A sets rules for EV charging outlets in multi-storeyed buildings and homes (pp22–25). Metering and billing follow: meter replacement, RE meter defect assessment, downloadable bill details, advance payment, one-time settlement schemes, disconnection reminders, and a substituted Regulation 164 on consumer-reported tampering (pp25–30). Finally, a new Annexure 23 governs single point supply and sharing of electricity charges among sub-consumers, covering premises eligible, metering arrangements and licensee takeover on default (pp30–31).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

The regulation

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (1)

11 more documents belong here and are not on Voltaic: 11 copies in another language.

Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on dev.erckerala.org ↗

Report an issue with this document