KSERC · Kerala State Electricity Regulatory Commission
Kerala Electricity Supply Code, 2014 — Fifth Amendment Code, 2024
Kerala Electricity Supply (Fifth Amendment) Code, 2024
Amendment · Gazette copyDated 26 Jul 2024Published in the Gazette 31 Jul 2024No. 1234/Con.Engg/2023/KSERC dated 26th July, 2024
The Gazette copy of the Kerala Electricity Supply Code, 2014 — Fifth Amendment, 2024.
Summary
Summary written by software, from pages 1 to 31 of 38. Check the regulator's original before you rely on it.
KSERC Notification No. 1234/Con.Engg/2023/KSERC dated 26 July 2024, printed in the Kerala Gazette Extraordinary of 31 July 2024, makes the Kerala Electricity Supply (Fifth Amendment) Code, 2024. It amends the Kerala Electricity Supply Code, 2014 under s.181(1) read with s.50 of the Electricity Act, 2003, and comes into force on Gazette publication (p1). It is a large, wide-ranging amendment: dozens of regulations are substituted, inserted or tweaked, plus one new Annexure.
Regulation 2 is rewritten wholesale, restating the Code's dictionary — what an agreement, applicant, connected load, contract demand, check meter, defective meter, demand factor, due date, occupier, temporary connection and the new grievance bodies (CGRF and IGRC) mean (pp2–5). New definitions include 'Nano household units', limited to 5 hp/4 kW connected to a domestic installation at domestic tariff (p5).
Voltage and load architecture is reset. Regulation 8's voltage-wise load table is substituted and its provisos dropped; a Note discourages future 22 kV networks; a new Regulation 8A sets special conditions for supply at different voltage levels, including permitted overshoot where higher-voltage lines do not exist, motor-size limits, dedicated-cable cases and 400 kV connectivity (pp6–7). Regulation 11 is replaced with new LT demand-based metering limits and a demand-factor method; Regulation 12 is replaced so that power quality impairing units must take a dedicated feeder at their own cost, with an exemption route through soft starters and harmonic filters (pp8–9).
Connection economics are re-cast around a per kVA/kW rate. Regulations 32 and 33 are amended so the licensee recovers expenditure on Commission-approved per kVA/kW rates for LT and 11 kV consumers, with annual rate proposals and energization charges for dwelling units; Regulations 36, 37 and 49 are conformed, and Regulation 46 is omitted altogether (pp10–12). A new Regulation 50A introduces power feasibility sanction for prospective consumers above 20 kW/kVA, with advance cost recovery, and Regulations 58 and 59 are amended to match (pp12–14). Regulations 70, 71 and 73 give landlords and tenants separate accounts for security deposits on rented premises (pp14–15).
The service-connection process is pushed online. Regulations 75 to 79 are substituted — default online application modes with Aadhaar/OTP authentication, auto-generated demands, two-document applications, inspection and re-inspection timelines — and Regulations 80, 81, 82, 83 and 85 are amended, including a new Regulation 85 timeline table with an Explanation for cases needing network extension (pp15–22). Later regulations move shifting, load enhancement and regularisation online, and a new Regulation 90A sets rules for EV charging outlets in multi-storeyed buildings and homes (pp22–25). Metering and billing follow: meter replacement, RE meter defect assessment, downloadable bill details, advance payment, one-time settlement schemes, disconnection reminders, and a substituted Regulation 164 on consumer-reported tampering (pp25–30). Finally, a new Annexure 23 governs single point supply and sharing of electricity charges among sub-consumers, covering premises eligible, metering arrangements and licensee takeover on default (pp30–31).
Read with this
The regulation
- Dated 31 Jan 2014Kerala Electricity Supply Code, 2014
Amendments and corrections
- Dated 8 May 2015Kerala Electricity Supply Code, 2014 — Amendment, 2015
- Dated 11 Jan 2016Kerala Electricity Supply Code, 2014 — Amendment Code, 2016
- Dated 24 Jan 2017Kerala Electricity Supply (Amendment) Code, 2017
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
- Dated 26 Jul 2024Kerala Electricity Supply Code, 2014 — Fifth Amendment, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 23 Sep 2014Kerala Electricity Supply Code (Removal of Difficulties) Orders, 2014 — First to Fourth
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 2 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Fifth Order, 2015
- Dated 3 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015
- Dated 23 Jun 2015Kerala Electricity Supply Code — Sixth Removal of Difficulties Order, 2015
- Dated 11 Jul 2016Kerala Electricity Supply Code (Removal of Difficulties) Sixth Order, 2015 — validity extension to 30.09.2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 26 Oct 2016Kerala Electricity Supply Code (Removal of Difficulties) Order, 2016
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 20 Nov 2024Kerala Electricity Supply Code (Removal of Difficulties) Order, 2024
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 6 Jan 2025Kerala Electricity Supply Code (Removal of Difficulties) Order, 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Apr 2025Kerala Electricity Supply Code (Removal of Difficulties) (Second Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
- Dated 9 Oct 2025Kerala Electricity Supply Code (Removal of Difficulties) (Third Order), 2025
Consolidated copies, for reference (1)
- Dated 14 Oct 2025Kerala Electricity Supply Code, 2014 (as amended)
Other copies of these documents (1)
- Dated 22 Jan 2020Kerala Electricity Supply (Amendment) Code, 2020
11 more documents belong here and are not on Voltaic: 11 copies in another language.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.